{"success":true,"data":{"pressRelease":{"id":"116271","rtpr_id":"nPreMmLPLa","ticker":"SKAB","exchange":"Nasdaq Stockholm","all_tickers":["SKAB"],"title":"Skanska signs additional contract for medical office building in Durham, NC, USA, for USD 68M, about SEK 630M","author":"PR Newswire","published_at":"2026-08-12T06:46:26.112Z","article_body":"Skanska signs additional contract for medical office building in Durham, NC,\nUSA, for USD 68M, about SEK 630M\nPR Newswire\n\nSTOCKHOLM, Aug. 12, 2026\n\nSTOCKHOLM, Aug. 12, 2026 /PRNewswire/ -- Skanska has signed an additional\ncontract with UNC Health (UNCH) for the construction of a new medical office\nbuilding and parking deck in North Carolina, USA, as the start of a new\ngreenfield medical campus. The additional contract is worth USD 68M, about SEK\n630M, which will be included in the US order bookings for the third quarter of\n2026.\n\nThe full project scope includes site development, infrastructure, early\nequipment, and core and shell for a new six floor, approximately 17,700 square\nmeters (191,000 SF) medical office building and an 890-space parking deck.\nSignificant prefabricated elements are planned for the project, including\nunitized curtainwall systems, prefabricated exterior wall cladding, and\noffsite prefabricated exam room pods. The project will also establish new\ndesign and construction standards for UNCH's outpatient facilities.\n\nThe project began in June 2026 and is expected to reach completion in April\n2028.\n\nFor further information please contact:\nJessica Wheeler, Communications Director, Skanska USA, tel +1 919 717 3429\nAndreas Joons, Press Officer, Skanska AB, tel +46 76 870 75 51\nDirect line for media, tel +46 (0)10 448 88 99\n\nThis and previous releases can also be found at www.skanska.com.\n\nThis information was brought to you by Cision http://news.cision.com.\n\nhttps://news.cision.com/skanska/r/skanska-signs-additional-contract-for-medical-office-building-in-durham--nc--usa--for-usd-68m--about,c4382264\n\nThe following files are available for download:\n\n https://mb.cision.com/Main/95/4382264/4215421.pdf  20260812 US medical office building  \n\n \n\nView original\ncontent:https://www.prnewswire.co.uk/news-releases/skanska-signs-additional-contract-for-medical-office-building-in-durham-nc-usa-for-usd-68m-about-sek-630m-302849433.html\n\n\n\nCopyright (c) 2026 PR Newswire Association,LLC. All Rights Reserved.","article_body_html":"","raw_payload":{"data":{"id":"nPreMmLPLa","title":"Skanska signs additional contract for medical office building in Durham, NC, USA, for USD 68M, about SEK 630M","author":"PR Newswire","ticker":"SKAB","created":"2026-08-12T06:46:26.112Z","tickers":["SKAB"],"exchange":"Nasdaq Stockholm","article_body":"Skanska signs additional contract for medical office building in Durham, NC,\nUSA, for USD 68M, about SEK 630M\nPR Newswire\n\nSTOCKHOLM, Aug. 12, 2026\n\nSTOCKHOLM, Aug. 12, 2026 /PRNewswire/ -- Skanska has signed an additional\ncontract with UNC Health (UNCH) for the construction of a new medical office\nbuilding and parking deck in North Carolina, USA, as the start of a new\ngreenfield medical campus. The additional contract is worth USD 68M, about SEK\n630M, which will be included in the US order bookings for the third quarter of\n2026.\n\nThe full project scope includes site development, infrastructure, early\nequipment, and core and shell for a new six floor, approximately 17,700 square\nmeters (191,000 SF) medical office building and an 890-space parking deck.\nSignificant prefabricated elements are planned for the project, including\nunitized curtainwall systems, prefabricated exterior wall cladding, and\noffsite prefabricated exam room pods. The project will also establish new\ndesign and construction standards for UNCH's outpatient facilities.\n\nThe project began in June 2026 and is expected to reach completion in April\n2028.\n\nFor further information please contact:\nJessica Wheeler, Communications Director, Skanska USA, tel +1 919 717 3429\nAndreas Joons, Press Officer, Skanska AB, tel +46 76 870 75 51\nDirect line for media, tel +46 (0)10 448 88 99\n\nThis and previous releases can also be found at www.skanska.com.\n\nThis information was brought to you by Cision http://news.cision.com.\n\nhttps://news.cision.com/skanska/r/skanska-signs-additional-contract-for-medical-office-building-in-durham--nc--usa--for-usd-68m--about,c4382264\n\nThe following files are available for download:\n\n https://mb.cision.com/Main/95/4382264/4215421.pdf  20260812 US medical office building  \n\n \n\nView original\ncontent:https://www.prnewswire.co.uk/news-releases/skanska-signs-additional-contract-for-medical-office-building-in-durham-nc-usa-for-usd-68m-about-sek-630m-302849433.html\n\n\n\nCopyright (c) 2026 PR Newswire Association,LLC. All Rights Reserved."},"type":"article","timestamp":"2026-08-12T06:46:26.168852392Z","server_sent_at_ms":1786517186168},"received_at":"2026-08-12T06:46:26.220Z","source_url":null},"analysis":{"id":"105264","press_release_id":"116271","analysis_json":{"industry":{"label":"Construction & Engineering","sector":"Industrials"},"redFlags":[],"eventType":"operations_update","narrative":"Skanska has signed an additional contract worth USD 68M with UNC Health to construct a medical office building and parking deck in Durham, NC.\n\nThe project covers 17,700 square meters and 890 parking spaces, with construction expected to be completed by April 2028.\n\nThis contract value will be included in the US order bookings for the third quarter of 2026.","sentiment":"bullish","agentHooks":{"shouldPost":false,"suggestedAngle":"Routine contract win adds $68M to Q3 bookings."},"keyFigures":{"customDimensions":{"area_sqm":17700,"parking_spaces":890,"contract_value_sek":630000000,"contract_value_usd":68000000}},"quotedText":"","namedEntities":{"people":[{"name":"Jessica Wheeler","role":"Communications Director, Skanska USA"},{"name":"Andreas Joons","role":"Press Officer, Skanska AB"}],"products":[],"companies":[{"name":"UNC Health","relationship":"customer"}],"dollarAmounts":[{"amount":"USD 68M","context":"additional contract value"},{"amount":"SEK 630M","context":"additional contract value"}]},"materialImpact":{"score":3,"reasoning":"Skanska secured a material contract worth USD 68M for a new greenfield medical campus project, which will be included in Q3 order bookings."},"tickerRelevance":{"others":[],"primary":"SKAB"},"globalImportance":20,"audienceRelevance":15,"eventTypeSecondary":[],"importanceComponents":{"tickerTier":"large-cap","eventGravity":"contract_win"}},"event_type":"operations_update","event_type_secondary":null,"sentiment":"bullish","material_impact_score":3,"narrative":"Skanska has signed an additional contract worth USD 68M with UNC Health to construct a medical office building and parking deck in Durham, NC.\n\nThe project covers 17,700 square meters and 890 parking spaces, with construction expected to be completed by April 2028.\n\nThis contract value will be included in the US order bookings for the third quarter of 2026.","key_figures":{"customDimensions":{"area_sqm":17700,"parking_spaces":890,"contract_value_sek":630000000,"contract_value_usd":68000000}},"named_entities":{"people":[{"name":"Jessica Wheeler","role":"Communications Director, Skanska USA"},{"name":"Andreas Joons","role":"Press Officer, Skanska AB"}],"products":[],"companies":[{"name":"UNC Health","relationship":"customer"}],"dollarAmounts":[{"amount":"USD 68M","context":"additional contract value"},{"amount":"SEK 630M","context":"additional contract value"}]},"model_name":"glm-4.7","prompt_hash":"sha256:727b4b9429a443af","schema_hash":"sha256:05005c02d9cffac9","created_at":"2026-08-12T06:53:30.165Z","global_importance":20,"audience_relevance":15,"importance_components":{"tickerTier":"large-cap","eventGravity":"contract_win"}},"durationMs":289959,"modelName":"glm-4.7"}}