{"success":true,"data":{"pressRelease":{"id":"120352","rtpr_id":"nGNX9gp59n","ticker":"TCEC","exchange":"","all_tickers":["TCEC"],"title":"Terra Clean Energy Corp. Announces Receipt of Utah Work Program Permits for the Marysvale Uranium Mines Project","author":"Globe Newswire","published_at":"2026-08-17T11:30:00.213Z","article_body":"Vancouver B.C., Aug. 17, 2026 (GLOBE NEWSWIRE) --  TERRA CLEAN ENERGY\nCORP. (“Terra” or the “Company”) (CSE: TCEC, OTCQB: TCEFF, FSE:\nC9O0) is pleased to announce that it has received the required permits from\nthe Utah Department of Natural Resources Division of Oil, Gas and Mining to\ncommence its planned exploration work program at the Company’s 100%-owned\nMarysvale Uranium Mines Project located in Marysvale, Utah, United States.\n\nThe approved work program authorizes the construction of five drill pads to\nsupport a planned diamond core drill program and the excavation of 7\nexploration trenches designed to expose and evaluate known uranium-bearing\noutcrops. The program represents an important milestone as the Company\nadvances this exciting past producing uranium project.\n\nThe trenching program will allow Terra’s technical team to map and sample\nmineralized structures, verify historical geological interpretations, and\nrefine drill targets ahead of a planned diamond core drilling program this\nfall. The five permitted drill pads have been strategically positioned to test\npriority uranium targets identified through historical exploration, recent\ngeological modeling, and the Company’s completed radiometric and\nphotogrammetric surveys.\n\n“The receipt of these permits is a significant achievement for Terra and\nkeeps the Company on schedule for its planned exploration program,” said\nGreg Cameron, Chief Executive Officer of Terra “Our team has completed\nextensive technical work over the past year, including the compilation and\ndigitization of historical data, preparation of a NI 43-101 Technical Report,\nand construction of a comprehensive 3D geological model. We are now excited to\nbegin field activities that will advance the Marysvale Uranium Mines Project\ntoward drilling.”\n\nThe Company expects field crews to mobilize in September once a small Surety\nBond is posted with the BLM for reclamation post field work, with trenching to\ncommence first, followed by drill pad preparation and the initial diamond\ndrilling program. Results from the trenching program will be incorporated into\nthe final drill targeting process.\n\nThe Marysvale Uranium Mines Project is situated within Utah’s historic\nMarysvale Uranium District, one of the most productive uranium regions in the\nwestern United States. The project includes the past-producing Prospector and\nFreedom uranium mines, which historically accounted for a substantial portion\nof the district’s uranium production of 1.33 Mlbs U3O8 at reported average\ngrades of 0.22% *. Terra Clean Energy believes the combination of historical\nproduction, documented uranium mineralization, and modern exploration\ntechniques provides significant potential for new uranium discoveries a\nsignificant uranium resource.\n\nFurther updates will be provided as exploration activities progress.\n\n \n\nPlease click to view image\n(https://www.globenewswire.com/Tracker?data=QJghk6L2Ent5ZnYFUBA0D2XIX1H91W1-flaYDLabrDBuADuxTGn-75bku6459j54rU2gtPYSCvFWgFO7I_x5uvsNkfo9ihp_igzpqDpGfQx094sIPmkMYI0_z5-9ekdHUlPax-PwwW9mv51Nt4vJX1SxbrYh0-RGYXQWYgFOsj10lq7fWdjIbCmyGt9K_Dm9)\n\n*The historical results, production, and interpretation described here in have\nnot been verified and are extracted from US Geological Survey reports. The\nCompany has not completed sufficient work to confirm and validate any of the\nhistorical data contained in this news release. The historical work does not\nmeet NI 43-101 standards. The Company considers the historical work a reliable\nindication of the potential of the Marysvale Uranium District and the\ninformation may be of assistance to readers.\n\nGruner, J.W., Fetzer, W.G., and Rapaport, I., 1951, The Uranium Deposits near\nMarysvale, Piute County, Utah, Economic Geology Vol 46 No 3, pp. 243-251. \n\nSteven, T.A., Cunningham, C. G., Naeser, C.W., and Mehnert, H.H., 1979,\nRevised stratigraphy and radiometric ages of volcanic rocks in the Marysvale\narea, west-central Utah: U.S. Geological Survey Bulletin 1469, 40 p. \n\nAdditionally, an independent comment on the Company’s recent activities can\nbe found at:\nhttps://briefglance.com/articles/digital-ghosts-reviving-utahs-cold-war-uranium-mines-with-modern-tech\n\nQualified Person\n\nThe scientific and technical information contained in this news release has\nbeen reviewed and approved in accordance with the Canadian regulatory\nrequirements set out in National Instrument 43-101, on behalf of the Company\nby C. Trevor Perkins, P.Geo., Vice President Exploration for Terra Clean\nEnergy Corp., and a Qualified Person as defined by National Instrument 43-101.\n\nAbout Terra Clean Energy Corp.\n\nTerra Clean Energy Corp. is a Canadian-based uranium exploration and\ndevelopment company. The Company is currently developing the South Falcon East\nuranium project located in the Athabasca Basin region, Saskatchewan, Canada as\nwell as past producing uranium mines in Utah and uranium exploration\nproperties in Wyoming, United States. The Company’s strategy is to find and\nadvance late stage uranium projects to support growing demand for Nuclear\nPower and secure domestic mineral supply chains \n\nON BEHALF OF THE BOARD OF TERRA CLEAN ENERGY CORP.\n\n“Greg Cameron”\nGreg Cameron, CEO\n             \nForward-Looking Information\nThis news release contains certain statements that may be deemed\n“forward-looking statements”. Forward-looking statements are statements\nthat are not historical facts and are generally, but not always, identified by\nthe words “expects”, “plans”, “anticipates”, “believes”,\n“intends”, “estimates”, “projects”, “potential” and similar\nexpressions, or that events or conditions “will”, “would”, “may”,\n“could” or “should” occur. Forward-looking statements may include,\nwithout limitation, statements relating to the Company’s planned exploration\nactivities on properties and the potential development of mineral resources\nand mineral reserves which may or may not occur. Although the Company believes\nthe expectations expressed in such forward-looking statements are based on\nreasonable assumptions, such statements are not guarantees of future\nperformance, are subject to risks and uncertainties, and actual results or\nrealities may differ materially from those in the forward-looking statements.\nSuch material risks and uncertainties include, but are not limited to:\ncompetition within the industry; actual results of current exploration\nactivities; environmental risks; changes in project parameters as plans\ncontinue to be refined; future price of commodities; failure of equipment or\nprocesses to operate as anticipated; accidents, and other risks of the mining\nindustry; delays in obtaining approvals or financing; risks related to\nindebtedness and the service of such indebtedness; as well as those factors,\nrisks and uncertainties identified and reported in the Company’s public\nfilings under the Company’s SEDAR+ profile at www.sedarplus.ca. Although\nthe Company has attempted to identify important factors that could cause\nactual actions, events or results to differ materially from those described in\nforward-looking information, there may be other factors that cause actions,\nevents or results not to be as anticipated, estimated or intended.\nAccordingly, readers should not place undue reliance on forward-looking\nstatements. There can be no assurance that such information will prove to be\naccurate as actual results and future events could differ materially from\nthose anticipated in such statements. Forward-looking statements are made as\nof the date hereof and, accordingly, are subject to change after such date.\nThe Company disclaims any intention or obligation to update or revise any\nforward-looking information, whether as a result of new information, future\nevents or otherwise unless required by law.\n\nNeither the CSE nor its Regulation Services Provider (as that term is defined\nin the policies of the CSE) accepts responsibility for the adequacy or\naccuracy of this release.\n\nFor further information please contact:\n\nGreg Cameron, CEO\ninfo@tcec.energy \n416-277-6174\n\nTerra Clean Energy Corp\n1133 Melville Street, Suite 2700\nVancouver, BC V6E 4E5\nwww.tcec.energy \n\n(https://www.globenewswire.com/NewsRoom/AttachmentNg/3334cca5-cc01-4f64-8107-1ee4341d1684)\n\n\n\nGlobeNewswire, Inc. 2026","article_body_html":"","raw_payload":{"data":{"id":"nGNX9gp59n","title":"Terra Clean Energy Corp. Announces Receipt of Utah Work Program Permits for the Marysvale Uranium Mines Project","author":"Globe Newswire","ticker":"TCEC","created":"2026-08-17T11:30:00.213Z","tickers":["TCEC"],"exchange":"","article_body":"Vancouver B.C., Aug. 17, 2026 (GLOBE NEWSWIRE) --  TERRA CLEAN ENERGY\nCORP. (“Terra” or the “Company”) (CSE: TCEC, OTCQB: TCEFF, FSE:\nC9O0) is pleased to announce that it has received the required permits from\nthe Utah Department of Natural Resources Division of Oil, Gas and Mining to\ncommence its planned exploration work program at the Company’s 100%-owned\nMarysvale Uranium Mines Project located in Marysvale, Utah, United States.\n\nThe approved work program authorizes the construction of five drill pads to\nsupport a planned diamond core drill program and the excavation of 7\nexploration trenches designed to expose and evaluate known uranium-bearing\noutcrops. The program represents an important milestone as the Company\nadvances this exciting past producing uranium project.\n\nThe trenching program will allow Terra’s technical team to map and sample\nmineralized structures, verify historical geological interpretations, and\nrefine drill targets ahead of a planned diamond core drilling program this\nfall. The five permitted drill pads have been strategically positioned to test\npriority uranium targets identified through historical exploration, recent\ngeological modeling, and the Company’s completed radiometric and\nphotogrammetric surveys.\n\n“The receipt of these permits is a significant achievement for Terra and\nkeeps the Company on schedule for its planned exploration program,” said\nGreg Cameron, Chief Executive Officer of Terra “Our team has completed\nextensive technical work over the past year, including the compilation and\ndigitization of historical data, preparation of a NI 43-101 Technical Report,\nand construction of a comprehensive 3D geological model. We are now excited to\nbegin field activities that will advance the Marysvale Uranium Mines Project\ntoward drilling.”\n\nThe Company expects field crews to mobilize in September once a small Surety\nBond is posted with the BLM for reclamation post field work, with trenching to\ncommence first, followed by drill pad preparation and the initial diamond\ndrilling program. Results from the trenching program will be incorporated into\nthe final drill targeting process.\n\nThe Marysvale Uranium Mines Project is situated within Utah’s historic\nMarysvale Uranium District, one of the most productive uranium regions in the\nwestern United States. The project includes the past-producing Prospector and\nFreedom uranium mines, which historically accounted for a substantial portion\nof the district’s uranium production of 1.33 Mlbs U3O8 at reported average\ngrades of 0.22% *. Terra Clean Energy believes the combination of historical\nproduction, documented uranium mineralization, and modern exploration\ntechniques provides significant potential for new uranium discoveries a\nsignificant uranium resource.\n\nFurther updates will be provided as exploration activities progress.\n\n \n\nPlease click to view image\n(https://www.globenewswire.com/Tracker?data=QJghk6L2Ent5ZnYFUBA0D2XIX1H91W1-flaYDLabrDBuADuxTGn-75bku6459j54rU2gtPYSCvFWgFO7I_x5uvsNkfo9ihp_igzpqDpGfQx094sIPmkMYI0_z5-9ekdHUlPax-PwwW9mv51Nt4vJX1SxbrYh0-RGYXQWYgFOsj10lq7fWdjIbCmyGt9K_Dm9)\n\n*The historical results, production, and interpretation described here in have\nnot been verified and are extracted from US Geological Survey reports. The\nCompany has not completed sufficient work to confirm and validate any of the\nhistorical data contained in this news release. The historical work does not\nmeet NI 43-101 standards. The Company considers the historical work a reliable\nindication of the potential of the Marysvale Uranium District and the\ninformation may be of assistance to readers.\n\nGruner, J.W., Fetzer, W.G., and Rapaport, I., 1951, The Uranium Deposits near\nMarysvale, Piute County, Utah, Economic Geology Vol 46 No 3, pp. 243-251. \n\nSteven, T.A., Cunningham, C. G., Naeser, C.W., and Mehnert, H.H., 1979,\nRevised stratigraphy and radiometric ages of volcanic rocks in the Marysvale\narea, west-central Utah: U.S. Geological Survey Bulletin 1469, 40 p. \n\nAdditionally, an independent comment on the Company’s recent activities can\nbe found at:\nhttps://briefglance.com/articles/digital-ghosts-reviving-utahs-cold-war-uranium-mines-with-modern-tech\n\nQualified Person\n\nThe scientific and technical information contained in this news release has\nbeen reviewed and approved in accordance with the Canadian regulatory\nrequirements set out in National Instrument 43-101, on behalf of the Company\nby C. Trevor Perkins, P.Geo., Vice President Exploration for Terra Clean\nEnergy Corp., and a Qualified Person as defined by National Instrument 43-101.\n\nAbout Terra Clean Energy Corp.\n\nTerra Clean Energy Corp. is a Canadian-based uranium exploration and\ndevelopment company. The Company is currently developing the South Falcon East\nuranium project located in the Athabasca Basin region, Saskatchewan, Canada as\nwell as past producing uranium mines in Utah and uranium exploration\nproperties in Wyoming, United States. The Company’s strategy is to find and\nadvance late stage uranium projects to support growing demand for Nuclear\nPower and secure domestic mineral supply chains \n\nON BEHALF OF THE BOARD OF TERRA CLEAN ENERGY CORP.\n\n“Greg Cameron”\nGreg Cameron, CEO\n             \nForward-Looking Information\nThis news release contains certain statements that may be deemed\n“forward-looking statements”. Forward-looking statements are statements\nthat are not historical facts and are generally, but not always, identified by\nthe words “expects”, “plans”, “anticipates”, “believes”,\n“intends”, “estimates”, “projects”, “potential” and similar\nexpressions, or that events or conditions “will”, “would”, “may”,\n“could” or “should” occur. Forward-looking statements may include,\nwithout limitation, statements relating to the Company’s planned exploration\nactivities on properties and the potential development of mineral resources\nand mineral reserves which may or may not occur. Although the Company believes\nthe expectations expressed in such forward-looking statements are based on\nreasonable assumptions, such statements are not guarantees of future\nperformance, are subject to risks and uncertainties, and actual results or\nrealities may differ materially from those in the forward-looking statements.\nSuch material risks and uncertainties include, but are not limited to:\ncompetition within the industry; actual results of current exploration\nactivities; environmental risks; changes in project parameters as plans\ncontinue to be refined; future price of commodities; failure of equipment or\nprocesses to operate as anticipated; accidents, and other risks of the mining\nindustry; delays in obtaining approvals or financing; risks related to\nindebtedness and the service of such indebtedness; as well as those factors,\nrisks and uncertainties identified and reported in the Company’s public\nfilings under the Company’s SEDAR+ profile at www.sedarplus.ca. Although\nthe Company has attempted to identify important factors that could cause\nactual actions, events or results to differ materially from those described in\nforward-looking information, there may be other factors that cause actions,\nevents or results not to be as anticipated, estimated or intended.\nAccordingly, readers should not place undue reliance on forward-looking\nstatements. There can be no assurance that such information will prove to be\naccurate as actual results and future events could differ materially from\nthose anticipated in such statements. Forward-looking statements are made as\nof the date hereof and, accordingly, are subject to change after such date.\nThe Company disclaims any intention or obligation to update or revise any\nforward-looking information, whether as a result of new information, future\nevents or otherwise unless required by law.\n\nNeither the CSE nor its Regulation Services Provider (as that term is defined\nin the policies of the CSE) accepts responsibility for the adequacy or\naccuracy of this release.\n\nFor further information please contact:\n\nGreg Cameron, CEO\ninfo@tcec.energy \n416-277-6174\n\nTerra Clean Energy Corp\n1133 Melville Street, Suite 2700\nVancouver, BC V6E 4E5\nwww.tcec.energy \n\n(https://www.globenewswire.com/NewsRoom/AttachmentNg/3334cca5-cc01-4f64-8107-1ee4341d1684)\n\n\n\nGlobeNewswire, Inc. 2026"},"type":"article","timestamp":"2026-08-17T11:30:00.2548654Z","server_sent_at_ms":1786966200254},"received_at":"2026-08-17T11:30:00.539Z","source_url":null},"analysis":{"id":"109339","press_release_id":"120352","analysis_json":{"industry":{"label":"Metals & Mining","sector":"Materials"},"redFlags":["Historical production figures (1.33 Mlbs U3O8 at 0.22% grade) are sourced from USGS reports and have not been verified or confirmed by a Qualified Person under NI 43-101 standards."],"eventType":"operations_update","narrative":"Terra Clean Energy received the necessary permits from the Utah Division of Oil, Gas and Mining to commence its planned exploration program at the 100%-owned Marysvale Uranium Mines Project.\n\nThe authorization covers the construction of five drill pads and the excavation of seven exploration trenches, with field crews expected to mobilize in September pending a small Surety Bond posting.\n\nThe project is located in a historic uranium district with past production of 1.33 Mlbs U3O8 at an average grade of 0.22%, though the company notes these historical figures have not been verified by NI 43-101 standards.","sentiment":"bullish","agentHooks":{"shouldPost":false,"suggestedAngle":"Routine permitting milestone achieved; mobilization to drilling phase pending bond posting."},"keyFigures":{"customDimensions":{"drill_pads_permitted":5,"historical_grade_percent":0.22,"historical_production_Mlbs":1.33,"exploration_trenches_permitted":7}},"quotedText":"The receipt of these permits is a significant achievement for Terra and keeps the Company on schedule for its planned exploration program","namedEntities":{"people":[{"name":"Greg Cameron","role":"Chief Executive Officer"},{"name":"C. Trevor Perkins","role":"Vice President Exploration"}],"products":["Marysvale Uranium Mines Project","South Falcon East uranium project"],"companies":[{"name":"Terra Clean Energy Corp.","ticker":"TCEC"},{"name":"Utah Department of Natural Resources Division of Oil, Gas and Mining","relationship":"regulatory body"}],"dollarAmounts":[]},"materialImpact":{"score":2,"reasoning":"Receipt of exploration permits is a routine de-risking step for a junior mining company, allowing work to proceed as planned but not constituting a resource discovery or production event."},"tickerRelevance":{"others":[],"primary":"TCEC"},"globalImportance":12,"audienceRelevance":12,"eventTypeSecondary":[],"importanceComponents":{"tickerTier":"micro-cap","eventGravity":"exploration-permit","sectorWeight":"materials"}},"event_type":"operations_update","event_type_secondary":null,"sentiment":"bullish","material_impact_score":2,"narrative":"Terra Clean Energy received the necessary permits from the Utah Division of Oil, Gas and Mining to commence its planned exploration program at the 100%-owned Marysvale Uranium Mines Project.\n\nThe authorization covers the construction of five drill pads and the excavation of seven exploration trenches, with field crews expected to mobilize in September pending a small Surety Bond posting.\n\nThe project is located in a historic uranium district with past production of 1.33 Mlbs U3O8 at an average grade of 0.22%, though the company notes these historical figures have not been verified by NI 43-101 standards.","key_figures":{"customDimensions":{"drill_pads_permitted":5,"historical_grade_percent":0.22,"historical_production_Mlbs":1.33,"exploration_trenches_permitted":7}},"named_entities":{"people":[{"name":"Greg Cameron","role":"Chief Executive Officer"},{"name":"C. Trevor Perkins","role":"Vice President Exploration"}],"products":["Marysvale Uranium Mines Project","South Falcon East uranium project"],"companies":[{"name":"Terra Clean Energy Corp.","ticker":"TCEC"},{"name":"Utah Department of Natural Resources Division of Oil, Gas and Mining","relationship":"regulatory body"}],"dollarAmounts":[]},"model_name":"glm-4.7","prompt_hash":"sha256:727b4b9429a443af","schema_hash":"sha256:05005c02d9cffac9","created_at":"2026-08-17T11:32:46.123Z","global_importance":12,"audience_relevance":12,"importance_components":{"tickerTier":"micro-cap","eventGravity":"exploration-permit","sectorWeight":"materials"}},"durationMs":73475,"modelName":"glm-4.7"}}