{"success":true,"data":{"pressRelease":{"id":"131207","rtpr_id":"nGNX9n541y","ticker":"NAU","exchange":"","all_tickers":["NAU"],"title":"Nevgold Files NI 43-101 Technical Report For Mineral Resource Estimate on the Limousine Butte Gold-Antimony Project, Nevada","author":"Globe Newswire","published_at":"2026-08-31T12:40:33.212Z","article_body":"Vancouver, British Columbia, Aug. 31, 2026 (GLOBE NEWSWIRE) -- NevGold Corp.\n(“NevGold” or the “Company”) (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50)\nis pleased to announce that it has filed a Technical Report on SEDAR+\nsupporting its maiden Mineral Resource Estimate (“MRE”) for the Limousine\nButte gold-antimony project (the “Project”, “Limo Butte”) in Nevada.\n\nThe technical report titled “NI 43-101 Technical Report: Mineral Resource\nEstimate, Limousine Butte Gold-Antimony Property” dated August 24, 2026,\nwith an effective date of July 15, 2026 (the “Technical Report”), was\nprepared by Gregory Z. Mosher, P. Geo., M.Sc. Applied, and Daniel W. Kappes,\nP.E. in accordance with National Instrument 43-101 - Standards of Disclosure\nfor Mineral Projects (“NI 43-101”) and supports the MRE disclosure made by\nthe Company in its news release dated July 15, 2026. A full copy of the\nTechnical Report can be found at SEDAR+ (www.sedarplus.ca) under the\nCompany’s issuer profile.\n\nThere are no material differences between the MRE in the Technical Report and\nthe information previously disclosed in the Company’s news release dated\nJuly 15, 2026.\n\nNevGold CEO, Brandon Bonifacio, comments: “Our maiden, large-scale, oxide\ngold-antimony Mineral Resource Estimate was an important first step in\ndelivering on our uniquely positioned opportunity at Limo Butte. We have\ndelivered on one of the largest, most strategic, gold-antimony resources in\nthe United States, and our recently announced first drill results from 2026\nhave already expanded mineralization from the initial MRE. We have the\npotential to advance Limo Butte to a near-term antimony production scenario\nfrom the already mined material on surface from the historical gold leach\npads, while we systematically advance the other deposits with further drilling\nto add scale and increase grade. We have also made strong progress advancing\nthe next phase of Engineering Studies, which is another key upcoming milestone\nfor the Project. We will continue to build off this initial MRE, as it will be\na very active next period as our drill program continues with over 35 holes\nwith assays pending.”\n\nLimousine Butte Maiden Mineral Resource Estimate\nThe tables below are extracted from the MRE disclosed in the Technical Report.\n\nTable 1. Limo Butte – Consolidated Mineral Resource Estimate (see notes\nbelow)\n\n Zone                Tonnes (Mt)  Gold Grade (g/t)  Ounces Gold  Silver Grade (g/t)  Silver Ounces  Sb (%)  Sb (t)  \n Measured                                                                                                           \n Leach Pads          1.0          0.31              9,500        2.80                87,000         0.26%   2,600   \n Indicated                                                                                                          \n Leach Pads          1.2          0.29              11,600       2.43                96,700         0.30%   3,700   \n Pre-Strip Dump      0.09         0.30              900          0.13                400            0.65%   600     \n Resurrection        12.9         0.38              159,400      0.91                378,100        0.19%   24,900  \n Cadillac Valley     -            -                 -            -                   -              -       -       \n Northern Zones (8)  -            -                 -            -                   -              -       -       \n Total M&I           15.2         0.37              181,400      1.15                562,200        0.21%   31,800  \n Inferred                                                                                                           \n Leach Pads          -            -                 -            -                   -              -       -       \n Pre-Strip Dump      0.05         0.28              400          0.03                40             0.99%   500     \n Resurrection        28.5         0.29              261,600      0.87                799,100        0.12%   34,600  \n Cadillac Valley     57.2         0.37              686,500      0.49                895,700        0.07%   40,600  \n Northern Zones (8)  31.7         0.25              255,000      -                   -              -       -       \n Total Inferred      117.5        0.32              1,203,500    0.61                1,694,840      0.09%   75,700  \n\nTable 2. Limo Butte: Antimony Sub-Domains within the Consolidated Mineral\nResource Estimate (see notes below)\n\n Zone                Tonnes (Mt)  Gold Grade (g/t)  Ounces Gold  Silver Grade (g/t)  Silver Ounces  Sb (%)  Sb (t)  \n Measured                                                                                                           \n Leach Pads          1.0          0.31              9,500        2.80                87,000         0.26%   2,600   \n Indicated                                                                                                          \n Leach Pads          1.2          0.29              11,600       2.44                96,700         0.30%   3,700   \n Pre-Strip Dump      0.09         0.30              900          0.13                400            0.65%   600     \n Resurrection        9.1          0.37              107,500      0.97                283,500        0.25%   22,700  \n Cadillac Valley     -            -                 -            -                   -              -       -       \n Northern Zones (8)  -            -                 -            -                   -              -       -       \n Total M&I           11.3         0.36              129,500      1.28                467,600        0.26%   29,600  \n Inferred                                                                                                           \n Leach Pads          -            -                 -            -                   -              -       -       \n Pre-Strip Dump      0.04         0.28              400          0.03                40             1.02%   500     \n Resurrection        14.1         0.19              87,300       0.61                275,700        0.20%   27,600  \n Cadillac Valley     12.7         0.26              108,400      0.53                218,100        0.16%   20,000  \n Northern Zones (8)  -            -                 -            -                   -              -       -       \n Total Inferred      26.9         0.23              196,100      0.57                493,900        0.18%   48,100  \n\nTable 3. Limo Butte – Cut-Off Sensitivity Table (see notes below)\n\n Classification          Tonnes (Mt)  Gold Grade (g/t)  Ounces Gold  Silver Grade (g/t)  Silver Ounces  Sb (%)  Sb (t)   \n 0.60 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    8.9          0.51              144,200      1.41                400,000        0.28%   25,100   \n Inferred                51.8         0.41              690,700      1.08                700,220        0.14%   28,600   \n 0.45 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    11.3         0.44              160,600      1.28                463,100        0.25%   28,400   \n Inferred                70.3         0.38              868,000      0.83                1,036,340      0.12%   46,000   \n 0.30 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    15.2         0.37              181,400      1.15                562,200        0.21%   31,800   \n Inferred                117.5        0.32              1,203,500    0.61                1,694,840      0.09%   75,700   \n 0.15 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    23.1         0.28              204,900      0.98                729,300        0.16%   36,100   \n Inferred                221.9        0.23              1,628,900    0.49                2,997,940      0.06%   114,000  \n\nNotes to Tables above:\n1. Effective date of this mineral resource estimate is July 15, 2026.\n2. All mineral resources have been estimated in accordance with Canadian\nInstitute of Mining, Metallurgy and Petroleum definitions, as required under\nNI 43-101. The Mineral Resource Statement was prepared by Greg Mosher, P. Geo\n(Global Mineral Resource Services, “GMRS”) in accordance with NI 43-101.\n3. Ounce (troy) = metric tonnes x grade / 31.10348. All numbers have been\nrounded to reflect the relative accuracy of the estimate.\n4. The quantity and grade of reported Inferred Mineral Resources are uncertain\nin nature and there has not been sufficient work to define these Inferred\nMineral Resources as Indicated or Measured Mineral Resources. It is reasonably\nexpected that many of the Inferred Mineral Resources could be upgraded to\nIndicated Mineral Resources with continued exploration, however, there is no\nassurance that further exploration will result in all or any part of the\nInferred Mineral Resources being converted into Indicated Mineral Resources.\n5. Tonnages and ounces in the tables are rounded to the nearest thousand and\nhundred, respectively. Numbers may not total due to rounding.\n6. There are no known legal, political, environmental, or other risks that\ncould materially affect the development of the mineral resources. \n7. Mineral Resources for Leach Pads, Pre-Strip Dump, Resurrection, and\nCadillac Valley are reported at a cut-off grade of 0.30 g/t AuEq. for an\nopen-pit mining scenario contemplating recovery of gold and antimony. Cut-off\ngrades are based on a price of US$3,000/oz gold and US$35,000/tonne antimony,\nand a number of operating cost and recovery assumptions, including a\nreasonable contingency factor. Metallurgical recoveries of 80% for gold, and\n75% for antimony were used. Densities based on lithology were assigned.\n8. Mineral Resources for Northern Zones are reported at a cut-off grade of\n0.15 g/t Au for an open-pit mining scenario contemplating recovery of gold as\nthere is currently no antimony data for the Northern Zones. Cut-off grade was\nbased on a price of US$3,000/oz gold, and a number of operating cost and\nrecovery assumptions, including a reasonable contingency factor. Metallurgical\nrecoveries of 80% for gold was used. Densities based on lithology were\nassigned.\n9. Antimony mineral resources are reported as a subset of the total mineral\nresource within the conceptual pit shells used to constrain the total mineral\nresource in order to demonstrate potential for economic viability, as required\nunder NI 43-101; mineralization outside of these pit shells is not reported as\na mineral resource. Mineral resources are not mineral reserves and do not have\ndemonstrated economic viability. There is no guarantee that all or any part of\nthe estimated mineral resources will be converted into mineral reserves. These\nMineral Resource estimates include inferred Mineral Resources that are\nconsidered too speculative geologically to have economic considerations\napplied to them that would enable them to be categorized as Mineral Reserves.\nAll figures are rounded to reflect the relative accuracy of the estimate.\nNotes to Table 2:\n1. Open pit antimony subdomain is reported at a cutoff grade 0.1% antimony\nwithin the overall 0.30 g/t AuEq. cutoff. These higher-grade antimony zones\nare reported separately in Table 2 to illustrate the potential for antimony\nproduction from the Project and are contained within the overall mineral\nresource estimate reported in Table 1. Antimony zones are reported only if\nthey lie within the global resource estimate in Table 1.\nReaders are encouraged to review the Technical Report for detailed information\npertaining to the MRE and underlying assumptions, disclaimers and other\nimportant information.\n\nTechnical information contained in this news release has been reviewed and\napproved by Greg French, CPG, the Company’s Vice President, Exploration, who\nis NevGold’s Qualified Person under NI 43-101 and responsible for technical\nmatters of this release.\n\nON BEHALF OF THE BOARD\n\n“Signed”\n\nBrandon Bonifacio, President & CEO\n\nFor further information, please contact Brandon Bonifacio at\nbbonifacio@nev-gold.com, call 604-337-4997, or visit our website at\nwww.nev-gold.com.\n\nAbout the Company\nNevGold is dedicated to discovering, de-risking, and rapidly advancing gold\nand critical metals projects across premier jurisdictions in Nevada and Idaho\nto drive shareholder value and strengthen US mineral security. The Company\nholds a 100% interest in the Limousine Butte (gold-antimony) and Cedar Wash\n(gold) projects in Nevada, and the Nutmeg Mountain (gold) and Zeus (copper)\nprojects in Idaho. For more information, please visit www.nev-gold.com.\n\nNeither the TSX Venture Exchange nor its Regulation Services Provider (as that\nterm is defined in the policies of the TSX Venture Exchange) accepts\nresponsibility for the adequacy or accuracy of this release.\n\nCautionary Note Regarding Forward Looking Statements\n\nThis news release contains forward-looking statements that are based on the\nCompany’s current expectations and estimates. Forward-looking statements are\nfrequently characterized by words such as “plan”, “expect”,\n“project”, “intend”, “believe”, “anticipate”, “estimate”,\n“suggest”, “indicate” and other similar words or statements that\ncertain events or conditions “may” or “will” occur. Forward-looking\nstatements include, but are not limited to, statements regarding continued\nexploration on the Project, upgrading inferred mineral resources to indicated\nmineral resources, and entering the next phase of Engineering Studies. Such\nforward-looking statements involve known and unknown risks, uncertainties and\nother factors that could cause actual events or results to differ materially\nfrom estimated or anticipated events or results implied or expressed in such\nforward-looking statements. Such risks include, but are not limited to,\ndangers inherent in exploration, development and mining activities; the\nuncertainty of mineral resource estimates; actual exploration or development\nplans and costs differing materially from the Company’s estimates; obtaining\nadditional financing from time-to-time to continue operations; compliance with\ngovernment regulation; stock market volatility that may adversely affect the\nprice of the Company’s securities; the ability to obtain and maintain any\nnecessary permits, consents or authorizations required for mining activities;\ngeneral economic, market and business conditions, and the ability to obtain\nall necessary regulatory approvals. There is some risk that the\nforward-looking statements will not prove to be accurate, that the\nmanagement’s assumptions may not be correct or that actual results may\ndiffer materially from such forward-looking statements. Accordingly, readers\nshould not place undue reliance on the forward-looking statements. Any\nforward-looking statement speaks only as of the date on which it is made and,\nexcept as may be required by applicable securities laws, the Company disclaims\nany intent or obligation to update any forward-looking statement, whether as a\nresult of new information, future events or results or otherwise.\nForward-looking statements are not guarantees of future performance and\naccordingly undue reliance should not be put on such statements due to the\ninherent uncertainty therein.\n\n(https://www.globenewswire.com/NewsRoom/AttachmentNg/305d6e29-37f9-45b1-9a2e-4e5d0bd82d5a)\n\n\n\nGlobeNewswire, Inc. 2026","article_body_html":"","raw_payload":{"data":{"id":"nGNX9n541y","title":"Nevgold Files NI 43-101 Technical Report For Mineral Resource Estimate on the Limousine Butte Gold-Antimony Project, Nevada","author":"Globe Newswire","ticker":"NAU","created":"2026-08-31T12:40:33.212Z","tickers":["NAU"],"exchange":"","article_body":"Vancouver, British Columbia, Aug. 31, 2026 (GLOBE NEWSWIRE) -- NevGold Corp.\n(“NevGold” or the “Company”) (TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50)\nis pleased to announce that it has filed a Technical Report on SEDAR+\nsupporting its maiden Mineral Resource Estimate (“MRE”) for the Limousine\nButte gold-antimony project (the “Project”, “Limo Butte”) in Nevada.\n\nThe technical report titled “NI 43-101 Technical Report: Mineral Resource\nEstimate, Limousine Butte Gold-Antimony Property” dated August 24, 2026,\nwith an effective date of July 15, 2026 (the “Technical Report”), was\nprepared by Gregory Z. Mosher, P. Geo., M.Sc. Applied, and Daniel W. Kappes,\nP.E. in accordance with National Instrument 43-101 - Standards of Disclosure\nfor Mineral Projects (“NI 43-101”) and supports the MRE disclosure made by\nthe Company in its news release dated July 15, 2026. A full copy of the\nTechnical Report can be found at SEDAR+ (www.sedarplus.ca) under the\nCompany’s issuer profile.\n\nThere are no material differences between the MRE in the Technical Report and\nthe information previously disclosed in the Company’s news release dated\nJuly 15, 2026.\n\nNevGold CEO, Brandon Bonifacio, comments: “Our maiden, large-scale, oxide\ngold-antimony Mineral Resource Estimate was an important first step in\ndelivering on our uniquely positioned opportunity at Limo Butte. We have\ndelivered on one of the largest, most strategic, gold-antimony resources in\nthe United States, and our recently announced first drill results from 2026\nhave already expanded mineralization from the initial MRE. We have the\npotential to advance Limo Butte to a near-term antimony production scenario\nfrom the already mined material on surface from the historical gold leach\npads, while we systematically advance the other deposits with further drilling\nto add scale and increase grade. We have also made strong progress advancing\nthe next phase of Engineering Studies, which is another key upcoming milestone\nfor the Project. We will continue to build off this initial MRE, as it will be\na very active next period as our drill program continues with over 35 holes\nwith assays pending.”\n\nLimousine Butte Maiden Mineral Resource Estimate\nThe tables below are extracted from the MRE disclosed in the Technical Report.\n\nTable 1. Limo Butte – Consolidated Mineral Resource Estimate (see notes\nbelow)\n\n Zone                Tonnes (Mt)  Gold Grade (g/t)  Ounces Gold  Silver Grade (g/t)  Silver Ounces  Sb (%)  Sb (t)  \n Measured                                                                                                           \n Leach Pads          1.0          0.31              9,500        2.80                87,000         0.26%   2,600   \n Indicated                                                                                                          \n Leach Pads          1.2          0.29              11,600       2.43                96,700         0.30%   3,700   \n Pre-Strip Dump      0.09         0.30              900          0.13                400            0.65%   600     \n Resurrection        12.9         0.38              159,400      0.91                378,100        0.19%   24,900  \n Cadillac Valley     -            -                 -            -                   -              -       -       \n Northern Zones (8)  -            -                 -            -                   -              -       -       \n Total M&I           15.2         0.37              181,400      1.15                562,200        0.21%   31,800  \n Inferred                                                                                                           \n Leach Pads          -            -                 -            -                   -              -       -       \n Pre-Strip Dump      0.05         0.28              400          0.03                40             0.99%   500     \n Resurrection        28.5         0.29              261,600      0.87                799,100        0.12%   34,600  \n Cadillac Valley     57.2         0.37              686,500      0.49                895,700        0.07%   40,600  \n Northern Zones (8)  31.7         0.25              255,000      -                   -              -       -       \n Total Inferred      117.5        0.32              1,203,500    0.61                1,694,840      0.09%   75,700  \n\nTable 2. Limo Butte: Antimony Sub-Domains within the Consolidated Mineral\nResource Estimate (see notes below)\n\n Zone                Tonnes (Mt)  Gold Grade (g/t)  Ounces Gold  Silver Grade (g/t)  Silver Ounces  Sb (%)  Sb (t)  \n Measured                                                                                                           \n Leach Pads          1.0          0.31              9,500        2.80                87,000         0.26%   2,600   \n Indicated                                                                                                          \n Leach Pads          1.2          0.29              11,600       2.44                96,700         0.30%   3,700   \n Pre-Strip Dump      0.09         0.30              900          0.13                400            0.65%   600     \n Resurrection        9.1          0.37              107,500      0.97                283,500        0.25%   22,700  \n Cadillac Valley     -            -                 -            -                   -              -       -       \n Northern Zones (8)  -            -                 -            -                   -              -       -       \n Total M&I           11.3         0.36              129,500      1.28                467,600        0.26%   29,600  \n Inferred                                                                                                           \n Leach Pads          -            -                 -            -                   -              -       -       \n Pre-Strip Dump      0.04         0.28              400          0.03                40             1.02%   500     \n Resurrection        14.1         0.19              87,300       0.61                275,700        0.20%   27,600  \n Cadillac Valley     12.7         0.26              108,400      0.53                218,100        0.16%   20,000  \n Northern Zones (8)  -            -                 -            -                   -              -       -       \n Total Inferred      26.9         0.23              196,100      0.57                493,900        0.18%   48,100  \n\nTable 3. Limo Butte – Cut-Off Sensitivity Table (see notes below)\n\n Classification          Tonnes (Mt)  Gold Grade (g/t)  Ounces Gold  Silver Grade (g/t)  Silver Ounces  Sb (%)  Sb (t)   \n 0.60 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    8.9          0.51              144,200      1.41                400,000        0.28%   25,100   \n Inferred                51.8         0.41              690,700      1.08                700,220        0.14%   28,600   \n 0.45 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    11.3         0.44              160,600      1.28                463,100        0.25%   28,400   \n Inferred                70.3         0.38              868,000      0.83                1,036,340      0.12%   46,000   \n 0.30 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    15.2         0.37              181,400      1.15                562,200        0.21%   31,800   \n Inferred                117.5        0.32              1,203,500    0.61                1,694,840      0.09%   75,700   \n 0.15 g/t AuEq. cut-off                                                                                                  \n Measured & Indicated    23.1         0.28              204,900      0.98                729,300        0.16%   36,100   \n Inferred                221.9        0.23              1,628,900    0.49                2,997,940      0.06%   114,000  \n\nNotes to Tables above:\n1. Effective date of this mineral resource estimate is July 15, 2026.\n2. All mineral resources have been estimated in accordance with Canadian\nInstitute of Mining, Metallurgy and Petroleum definitions, as required under\nNI 43-101. The Mineral Resource Statement was prepared by Greg Mosher, P. Geo\n(Global Mineral Resource Services, “GMRS”) in accordance with NI 43-101.\n3. Ounce (troy) = metric tonnes x grade / 31.10348. All numbers have been\nrounded to reflect the relative accuracy of the estimate.\n4. The quantity and grade of reported Inferred Mineral Resources are uncertain\nin nature and there has not been sufficient work to define these Inferred\nMineral Resources as Indicated or Measured Mineral Resources. It is reasonably\nexpected that many of the Inferred Mineral Resources could be upgraded to\nIndicated Mineral Resources with continued exploration, however, there is no\nassurance that further exploration will result in all or any part of the\nInferred Mineral Resources being converted into Indicated Mineral Resources.\n5. Tonnages and ounces in the tables are rounded to the nearest thousand and\nhundred, respectively. Numbers may not total due to rounding.\n6. There are no known legal, political, environmental, or other risks that\ncould materially affect the development of the mineral resources. \n7. Mineral Resources for Leach Pads, Pre-Strip Dump, Resurrection, and\nCadillac Valley are reported at a cut-off grade of 0.30 g/t AuEq. for an\nopen-pit mining scenario contemplating recovery of gold and antimony. Cut-off\ngrades are based on a price of US$3,000/oz gold and US$35,000/tonne antimony,\nand a number of operating cost and recovery assumptions, including a\nreasonable contingency factor. Metallurgical recoveries of 80% for gold, and\n75% for antimony were used. Densities based on lithology were assigned.\n8. Mineral Resources for Northern Zones are reported at a cut-off grade of\n0.15 g/t Au for an open-pit mining scenario contemplating recovery of gold as\nthere is currently no antimony data for the Northern Zones. Cut-off grade was\nbased on a price of US$3,000/oz gold, and a number of operating cost and\nrecovery assumptions, including a reasonable contingency factor. Metallurgical\nrecoveries of 80% for gold was used. Densities based on lithology were\nassigned.\n9. Antimony mineral resources are reported as a subset of the total mineral\nresource within the conceptual pit shells used to constrain the total mineral\nresource in order to demonstrate potential for economic viability, as required\nunder NI 43-101; mineralization outside of these pit shells is not reported as\na mineral resource. Mineral resources are not mineral reserves and do not have\ndemonstrated economic viability. There is no guarantee that all or any part of\nthe estimated mineral resources will be converted into mineral reserves. These\nMineral Resource estimates include inferred Mineral Resources that are\nconsidered too speculative geologically to have economic considerations\napplied to them that would enable them to be categorized as Mineral Reserves.\nAll figures are rounded to reflect the relative accuracy of the estimate.\nNotes to Table 2:\n1. Open pit antimony subdomain is reported at a cutoff grade 0.1% antimony\nwithin the overall 0.30 g/t AuEq. cutoff. These higher-grade antimony zones\nare reported separately in Table 2 to illustrate the potential for antimony\nproduction from the Project and are contained within the overall mineral\nresource estimate reported in Table 1. Antimony zones are reported only if\nthey lie within the global resource estimate in Table 1.\nReaders are encouraged to review the Technical Report for detailed information\npertaining to the MRE and underlying assumptions, disclaimers and other\nimportant information.\n\nTechnical information contained in this news release has been reviewed and\napproved by Greg French, CPG, the Company’s Vice President, Exploration, who\nis NevGold’s Qualified Person under NI 43-101 and responsible for technical\nmatters of this release.\n\nON BEHALF OF THE BOARD\n\n“Signed”\n\nBrandon Bonifacio, President & CEO\n\nFor further information, please contact Brandon Bonifacio at\nbbonifacio@nev-gold.com, call 604-337-4997, or visit our website at\nwww.nev-gold.com.\n\nAbout the Company\nNevGold is dedicated to discovering, de-risking, and rapidly advancing gold\nand critical metals projects across premier jurisdictions in Nevada and Idaho\nto drive shareholder value and strengthen US mineral security. The Company\nholds a 100% interest in the Limousine Butte (gold-antimony) and Cedar Wash\n(gold) projects in Nevada, and the Nutmeg Mountain (gold) and Zeus (copper)\nprojects in Idaho. For more information, please visit www.nev-gold.com.\n\nNeither the TSX Venture Exchange nor its Regulation Services Provider (as that\nterm is defined in the policies of the TSX Venture Exchange) accepts\nresponsibility for the adequacy or accuracy of this release.\n\nCautionary Note Regarding Forward Looking Statements\n\nThis news release contains forward-looking statements that are based on the\nCompany’s current expectations and estimates. Forward-looking statements are\nfrequently characterized by words such as “plan”, “expect”,\n“project”, “intend”, “believe”, “anticipate”, “estimate”,\n“suggest”, “indicate” and other similar words or statements that\ncertain events or conditions “may” or “will” occur. Forward-looking\nstatements include, but are not limited to, statements regarding continued\nexploration on the Project, upgrading inferred mineral resources to indicated\nmineral resources, and entering the next phase of Engineering Studies. Such\nforward-looking statements involve known and unknown risks, uncertainties and\nother factors that could cause actual events or results to differ materially\nfrom estimated or anticipated events or results implied or expressed in such\nforward-looking statements. Such risks include, but are not limited to,\ndangers inherent in exploration, development and mining activities; the\nuncertainty of mineral resource estimates; actual exploration or development\nplans and costs differing materially from the Company’s estimates; obtaining\nadditional financing from time-to-time to continue operations; compliance with\ngovernment regulation; stock market volatility that may adversely affect the\nprice of the Company’s securities; the ability to obtain and maintain any\nnecessary permits, consents or authorizations required for mining activities;\ngeneral economic, market and business conditions, and the ability to obtain\nall necessary regulatory approvals. There is some risk that the\nforward-looking statements will not prove to be accurate, that the\nmanagement’s assumptions may not be correct or that actual results may\ndiffer materially from such forward-looking statements. Accordingly, readers\nshould not place undue reliance on the forward-looking statements. Any\nforward-looking statement speaks only as of the date on which it is made and,\nexcept as may be required by applicable securities laws, the Company disclaims\nany intent or obligation to update any forward-looking statement, whether as a\nresult of new information, future events or results or otherwise.\nForward-looking statements are not guarantees of future performance and\naccordingly undue reliance should not be put on such statements due to the\ninherent uncertainty therein.\n\n(https://www.globenewswire.com/NewsRoom/AttachmentNg/305d6e29-37f9-45b1-9a2e-4e5d0bd82d5a)\n\n\n\nGlobeNewswire, Inc. 2026"},"type":"article","timestamp":"2026-08-31T12:40:33.265855275Z","server_sent_at_ms":1788180033265},"received_at":"2026-08-31T12:40:33.433Z","source_url":"https://www.globenewswire.com/news-release/2026/08/31/3353311/0/en/nevgold-files-ni-43-101-technical-report-for-mineral-resource-estimate-on-the-limousine-butte-gold-antimony-project-nevada.html"},"analysis":{"id":"120111","press_release_id":"131207","analysis_json":{"industry":{"label":"Diversified Metals & Mining","sector":"Materials"},"redFlags":[],"eventType":"operations_update","narrative":"NevGold has filed the NI 43-101 Technical Report supporting the maiden Mineral Resource Estimate for its Limousine Butte gold-antimony project in Nevada, confirming previously disclosed figures.\n\nThe report consolidates a total of 15.2 million tonnes in the Measured and Indicated categories containing 181,400 ounces of gold, with an additional 117.5 million tonnes of Inferred resources totaling 1.2 million ounces of gold.\n\nManagement highlighted the potential for near-term antimony production from surface material and noted that 35 drill holes have assays pending, aiming to expand the current resource.","sentiment":"bullish","agentHooks":{"shouldPost":true,"suggestedAngle":"NevGold solidifies resource base with official NI 43-101 filing for Limousine Butte."},"keyFigures":{"customDimensions":{"tonnes_m_i":15.2,"ounces_gold_m_i":181400,"tonnes_inferred":117.5,"gold_grade_m_i_g_t":0.37,"antimony_m_i_tonnes":31800,"assays_pending_holes":35,"ounces_gold_inferred":1203500,"gold_grade_inferred_g_t":0.32,"antimony_inferred_tonnes":75700}},"quotedText":"Our maiden, large-scale, oxide gold-antimony Mineral Resource Estimate was an important first step in delivering on our uniquely positioned opportunity at Limo Butte.","namedEntities":{"people":[{"name":"Brandon Bonifacio","role":"President & CEO"},{"name":"Gregory Z. Mosher","role":"P. Geo., M.Sc. Applied"},{"name":"Daniel W. Kappes","role":"P.E."},{"name":"Greg French","role":"Vice President, Exploration"}],"products":["Limousine Butte Project","Limo Butte","Cedar Wash Project","Nutmeg Mountain Project","Zeus Project"],"companies":[{"name":"NevGold Corp.","ticker":"NAU"}],"dollarAmounts":[{"amount":"US$3,000/oz","context":"gold price assumption used for cut-off grade"},{"amount":"US$35,000/tonne","context":"antimony price assumption used for cut-off grade"}]},"materialImpact":{"score":3,"reasoning":"Filing of the NI 43-101 Technical Report formally validates the maiden Mineral Resource Estimate of 15.2 million tonnes Measured and Indicated and 117.5 million tonnes Inferred. While confirming previously disclosed figures, the report solidifies the asset base for the Limousine Butte project."},"tickerRelevance":{"others":[],"primary":"NAU"},"globalImportance":25,"audienceRelevance":20,"eventTypeSecondary":[],"importanceComponents":{"tickerTier":"micro-cap","eventGravity":"technical_report_filing","sectorWeight":"mining_exploration"}},"event_type":"operations_update","event_type_secondary":null,"sentiment":"bullish","material_impact_score":3,"narrative":"NevGold has filed the NI 43-101 Technical Report supporting the maiden Mineral Resource Estimate for its Limousine Butte gold-antimony project in Nevada, confirming previously disclosed figures.\n\nThe report consolidates a total of 15.2 million tonnes in the Measured and Indicated categories containing 181,400 ounces of gold, with an additional 117.5 million tonnes of Inferred resources totaling 1.2 million ounces of gold.\n\nManagement highlighted the potential for near-term antimony production from surface material and noted that 35 drill holes have assays pending, aiming to expand the current resource.","key_figures":{"customDimensions":{"tonnes_m_i":15.2,"ounces_gold_m_i":181400,"tonnes_inferred":117.5,"gold_grade_m_i_g_t":0.37,"antimony_m_i_tonnes":31800,"assays_pending_holes":35,"ounces_gold_inferred":1203500,"gold_grade_inferred_g_t":0.32,"antimony_inferred_tonnes":75700}},"named_entities":{"people":[{"name":"Brandon Bonifacio","role":"President & CEO"},{"name":"Gregory Z. Mosher","role":"P. Geo., M.Sc. Applied"},{"name":"Daniel W. Kappes","role":"P.E."},{"name":"Greg French","role":"Vice President, Exploration"}],"products":["Limousine Butte Project","Limo Butte","Cedar Wash Project","Nutmeg Mountain Project","Zeus Project"],"companies":[{"name":"NevGold Corp.","ticker":"NAU"}],"dollarAmounts":[{"amount":"US$3,000/oz","context":"gold price assumption used for cut-off grade"},{"amount":"US$35,000/tonne","context":"antimony price assumption used for cut-off grade"}]},"model_name":"glm-4.7","prompt_hash":"sha256:727b4b9429a443af","schema_hash":"sha256:05005c02d9cffac9","created_at":"2026-08-31T13:41:39.284Z","global_importance":25,"audience_relevance":20,"importance_components":{"tickerTier":"micro-cap","eventGravity":"technical_report_filing","sectorWeight":"mining_exploration"}},"durationMs":79373,"modelName":"glm-4.7"}}