{"success":true,"data":{"pressRelease":{"id":"164891","rtpr_id":"nGNX5k16T5-20261008","ticker":"BTDR","exchange":"NASDAQ","all_tickers":["BTDR"],"title":"Bitdeer AI Secures 60MW A103 Facility at Its Existing Cyberjaya, Malaysia Campus; Reaches Approximately 95% of Its Up-to-350MW Target Capacity","author":"Globe Newswire","published_at":"2026-10-08T20:30:00.254Z","article_body":"SINGAPORE, Oct. 08, 2026 (GLOBE NEWSWIRE) -- Bitdeer AI, part of Bitdeer\nTechnologies Group (NASDAQ: BTDR) (“Bitdeer AI”), an AI neocloud service\nprovider and preferred NVIDIA Cloud Partner, today announced that it has\nentered into an 8-year data center services agreement for A103, a 60MW AI\nCloud data center facility on the same Cyberjaya, Malaysia campus as its A101\nand A102 facilities.\n\nA103 is designed for liquid-cooled, rack-scale NVIDIA systems, including the\nnext-generation NVIDIA Vera Rubin platform, with energization expected in the\nfirst quarter of 2028. A103 is located on the existing Cyberjaya campus\nallowing Bitdeer AI to leverage established power, liquid cooling and\nnetworking to shorten the path to energization. Together with the A101 and\nA102 facilities, the Cyberjaya campus will represent approximately 71.5MW of\nAI Cloud data center capacity.\n\nWith the addition of the A103 facility, Bitdeer AI’s secured AI Cloud data\ncenter capacity — capacity owned or under an executed data center services\nagreement — totals approximately 333.5MW across facilities in Malaysia,\nNorway and the United States, representing approximately 95% of its target of\nup to 350MW to be delivered by the first quarter of 2028. All megawatt figures\nin this release refer to critical IT load.\n\nDemand for uncontracted capacity across Bitdeer AI’s AI Cloud sites remains\nstrong. Bitdeer AI’s active pipeline for AI Cloud capacity is estimated to\nexceed $10 billion.\n\n“We have secured approximately 95% of our up-to-350MW target with the\naddition of the A103 facility,” said Michael G. Potter, Chief Financial\nOfficer of Bitdeer Technologies Group. “Adding 60MW alongside the A101 and\nA102 facilities means we benefit from the power, the cooling and the network\ninfrastructure already in place, improving our time-to-market. A103 is also\nbuilt for the Vera Rubin generation, which is the capacity customers are\nasking us to reserve for 2028.”\n\nAbout Bitdeer AI\n\nBitdeer AI, part of Bitdeer Technologies Group (NASDAQ: BTDR), an AI neocloud\nservice provider, delivers GPU cloud and full-stack AI solutions designed to\nsimplify and scale intelligent computing and build AI computational\ninfrastructure to support the AI revolution. Headquartered in Singapore,\nBitdeer AI is a preferred NVIDIA Cloud Partner offering GPU Cloud, Model\nStudio, and AI Agent Builder services, supported by the Bitdeer Technologies\nGroup’s global data center network across the U.S., Norway, Bhutan, Canada,\nand Malaysia, with a target of up to 350MW of AI-ready data center capacity to\nbe delivered by the first quarter of 2028. The company enables organizations\nacross industries to advance impactful AI initiatives and drive meaningful\ngoals globally. For more information, please visit https://www.bitdeer.ai.\n\nTo learn more, visit https://ir.bitdeer.com/ or follow Bitdeer AI on X\n@Bitdeer_AI\n(https://www.globenewswire.com/Tracker?data=-wn8WANCRT9iaUaHyYqdoWU5i3Nn5r652zIrclBmGy3ygACPf1rEc5flYSupI5hhLi5jX5cutPfa0M3-I_d21Q==)\nand LinkedIn @Bitdeer AI\n(https://www.globenewswire.com/Tracker?data=-wn8WANCRT9iaUaHyYqdoStjJMZO_jxrtZddABMl0GrlpdCB4TB-GXMntp00icNh7C1kW_IYwJYETW6rMIYzWuLNzeN7Bwz7sL168647faw=).\n\nForward-Looking Statements\n\nThis press release contains forward-looking statements within the meaning of\nSection 27A of the Securities Act of 1933, as amended, Section 21E of the\nSecurities Exchange Act of 1934, as amended, and the safe harbor provisions of\nthe U.S. Private Securities Litigation Reform Act of 1995. All statements\nother than statements of historical fact contained in this press release are\nforward-looking statements. In some cases, forward-looking statements can be\nidentified by terminology such as “may,” “will,” “should,”\n“expects,” “intends,” “plans,” “anticipates,” “believes,”\n“estimates,” “predicts,” “potential,” “targets,”\n“continue,” “become,” “develop,” or the negative of these terms or\nother comparable terminology.\n\nForward-looking statements in this press release include, without limitation,\nstatements regarding the 60MW A103 facility secured on Bitdeer AI’s existing\nCyberjaya, Malaysia campus under an 8-year data center services agreement and\nthe expected timing of its development and energization in the first quarter\nof 2028; the expectation that leveraging established power, liquid cooling and\nnetwork infrastructure from the existing Cyberjaya campus will shorten the\npath to energization; the expectation that the Cyberjaya campus will represent\napproximately 71.5MW of AI Cloud data center capacity; the intended\nsuitability of A103 for liquid-cooled, rack-scale NVIDIA systems, including\nthe next-generation NVIDIA Vera Rubin platform; the estimated active pipeline\nfor AI Cloud capacity of more than $10 billion; the strength of customer\ndemand for AI Cloud capacity relative to market supply; the approximately\n333.5MW of secured AI Cloud data center capacity and its representation of\napproximately 95% of the up-to-350MW target; and the up-to-350MW AI-ready data\ncenter capacity target for delivery by the first quarter of 2028.\n\nNo offtake commitments have been entered into with respect to A103 capacity as\nof the date of this press release. There can be no assurance that commercial\ndiscussions relating to A103 will result in executed contracts, that any such\ncontracts will be executed on the expected timeline or ahead of energization,\nor that they will be on terms comparable to those previously announced by\nBitdeer Technologies Group (the “Company”). Prior contract terms,\nincluding those announced in respect of the A102 and A201 facilities, may not\nbe indicative of future results, and the expected contract values in this\npress release are estimates derived from those prior terms. The active\npipeline figure referred to above represents management’s estimate of the\naggregate potential contract value of opportunities under commercial\ndiscussion. It is not backlog, revenue, an executed contract or a binding\ncommitment, is calculated using assumptions as to capacity, term, pricing and\nservice mix that may not be realized, and there can be no assurance that any\nportion of it will result in executed contracts.\n\nThese forward-looking statements are based on management's current\nexpectations, assumptions, estimates and projections about the Company and the\nindustry in which it operates, and involve known and unknown risks,\nuncertainties and other factors that may cause actual results, performance or\nachievements to differ materially from those expressed or implied by any\nforward-looking statement. These risks and uncertainties include, but are not\nlimited to: the ability to convert commercial discussions and negotiations\ninto executed contracts on the expected timeline, the satisfaction of handover\nand other conditions under the Company’s data center agreements, the\nperformance of third-party data center developers and service providers, the\nreceipt of required regulatory, utility and other approvals, customer demand\nand performance, contract terms, equipment delivery schedules, site readiness\nand power availability, electricity tariffs, connected load and other utility\ncharges, data center construction and energization schedules, financing\narrangements and cost of capital, as well as the other risks and uncertainties\ndescribed under “Item 3. Key Information, D. Risk Factors” in the\nCompany’s most recent Annual Report on Form 20-F and in the Company’s\nsubsequent filings filed with, or reports furnished to, the U.S. Securities\nand Exchange Commission on Form 6-K, which are available at www.sec.gov and on\nthe Company's investor relations website.\n\nThese forward-looking statements speak only as of the date of this press\nrelease. The Company undertakes no obligation to update or revise any\nforward-looking statement, whether as a result of new information, future\nevents or otherwise, except as required by applicable law. Investors are\ncautioned not to place undue reliance on forward-looking statements.\n\nInvestor & Media Contacts\n\nInvestor Relations\nTesh Dahya, Head of Investor Relations – tesh.dahya@bitdeer.com\n\nMedia\nEunice Hwangbo, Director, Corporate Communications –\neunice.hwangbo@bitdeer.com\n\n(https://www.globenewswire.com/NewsRoom/AttachmentNg/0fc45a52-37be-4202-a43d-bf494832c8d5)\n\n\n\nGlobeNewswire, Inc. 2026","article_body_html":"","raw_payload":{"data":{"id":"nGNX5k16T5-20261008","title":"Bitdeer AI Secures 60MW A103 Facility at Its Existing Cyberjaya, Malaysia Campus; Reaches Approximately 95% of Its Up-to-350MW Target Capacity","author":"Globe Newswire","ticker":"BTDR","created":"2026-10-08T20:30:00.254Z","tickers":["BTDR"],"exchange":"NASDAQ","article_body":"SINGAPORE, Oct. 08, 2026 (GLOBE NEWSWIRE) -- Bitdeer AI, part of Bitdeer\nTechnologies Group (NASDAQ: BTDR) (“Bitdeer AI”), an AI neocloud service\nprovider and preferred NVIDIA Cloud Partner, today announced that it has\nentered into an 8-year data center services agreement for A103, a 60MW AI\nCloud data center facility on the same Cyberjaya, Malaysia campus as its A101\nand A102 facilities.\n\nA103 is designed for liquid-cooled, rack-scale NVIDIA systems, including the\nnext-generation NVIDIA Vera Rubin platform, with energization expected in the\nfirst quarter of 2028. A103 is located on the existing Cyberjaya campus\nallowing Bitdeer AI to leverage established power, liquid cooling and\nnetworking to shorten the path to energization. Together with the A101 and\nA102 facilities, the Cyberjaya campus will represent approximately 71.5MW of\nAI Cloud data center capacity.\n\nWith the addition of the A103 facility, Bitdeer AI’s secured AI Cloud data\ncenter capacity — capacity owned or under an executed data center services\nagreement — totals approximately 333.5MW across facilities in Malaysia,\nNorway and the United States, representing approximately 95% of its target of\nup to 350MW to be delivered by the first quarter of 2028. All megawatt figures\nin this release refer to critical IT load.\n\nDemand for uncontracted capacity across Bitdeer AI’s AI Cloud sites remains\nstrong. Bitdeer AI’s active pipeline for AI Cloud capacity is estimated to\nexceed $10 billion.\n\n“We have secured approximately 95% of our up-to-350MW target with the\naddition of the A103 facility,” said Michael G. Potter, Chief Financial\nOfficer of Bitdeer Technologies Group. “Adding 60MW alongside the A101 and\nA102 facilities means we benefit from the power, the cooling and the network\ninfrastructure already in place, improving our time-to-market. A103 is also\nbuilt for the Vera Rubin generation, which is the capacity customers are\nasking us to reserve for 2028.”\n\nAbout Bitdeer AI\n\nBitdeer AI, part of Bitdeer Technologies Group (NASDAQ: BTDR), an AI neocloud\nservice provider, delivers GPU cloud and full-stack AI solutions designed to\nsimplify and scale intelligent computing and build AI computational\ninfrastructure to support the AI revolution. Headquartered in Singapore,\nBitdeer AI is a preferred NVIDIA Cloud Partner offering GPU Cloud, Model\nStudio, and AI Agent Builder services, supported by the Bitdeer Technologies\nGroup’s global data center network across the U.S., Norway, Bhutan, Canada,\nand Malaysia, with a target of up to 350MW of AI-ready data center capacity to\nbe delivered by the first quarter of 2028. The company enables organizations\nacross industries to advance impactful AI initiatives and drive meaningful\ngoals globally. For more information, please visit https://www.bitdeer.ai.\n\nTo learn more, visit https://ir.bitdeer.com/ or follow Bitdeer AI on X\n@Bitdeer_AI\n(https://www.globenewswire.com/Tracker?data=-wn8WANCRT9iaUaHyYqdoWU5i3Nn5r652zIrclBmGy3ygACPf1rEc5flYSupI5hhLi5jX5cutPfa0M3-I_d21Q==)\nand LinkedIn @Bitdeer AI\n(https://www.globenewswire.com/Tracker?data=-wn8WANCRT9iaUaHyYqdoStjJMZO_jxrtZddABMl0GrlpdCB4TB-GXMntp00icNh7C1kW_IYwJYETW6rMIYzWuLNzeN7Bwz7sL168647faw=).\n\nForward-Looking Statements\n\nThis press release contains forward-looking statements within the meaning of\nSection 27A of the Securities Act of 1933, as amended, Section 21E of the\nSecurities Exchange Act of 1934, as amended, and the safe harbor provisions of\nthe U.S. Private Securities Litigation Reform Act of 1995. All statements\nother than statements of historical fact contained in this press release are\nforward-looking statements. In some cases, forward-looking statements can be\nidentified by terminology such as “may,” “will,” “should,”\n“expects,” “intends,” “plans,” “anticipates,” “believes,”\n“estimates,” “predicts,” “potential,” “targets,”\n“continue,” “become,” “develop,” or the negative of these terms or\nother comparable terminology.\n\nForward-looking statements in this press release include, without limitation,\nstatements regarding the 60MW A103 facility secured on Bitdeer AI’s existing\nCyberjaya, Malaysia campus under an 8-year data center services agreement and\nthe expected timing of its development and energization in the first quarter\nof 2028; the expectation that leveraging established power, liquid cooling and\nnetwork infrastructure from the existing Cyberjaya campus will shorten the\npath to energization; the expectation that the Cyberjaya campus will represent\napproximately 71.5MW of AI Cloud data center capacity; the intended\nsuitability of A103 for liquid-cooled, rack-scale NVIDIA systems, including\nthe next-generation NVIDIA Vera Rubin platform; the estimated active pipeline\nfor AI Cloud capacity of more than $10 billion; the strength of customer\ndemand for AI Cloud capacity relative to market supply; the approximately\n333.5MW of secured AI Cloud data center capacity and its representation of\napproximately 95% of the up-to-350MW target; and the up-to-350MW AI-ready data\ncenter capacity target for delivery by the first quarter of 2028.\n\nNo offtake commitments have been entered into with respect to A103 capacity as\nof the date of this press release. There can be no assurance that commercial\ndiscussions relating to A103 will result in executed contracts, that any such\ncontracts will be executed on the expected timeline or ahead of energization,\nor that they will be on terms comparable to those previously announced by\nBitdeer Technologies Group (the “Company”). Prior contract terms,\nincluding those announced in respect of the A102 and A201 facilities, may not\nbe indicative of future results, and the expected contract values in this\npress release are estimates derived from those prior terms. The active\npipeline figure referred to above represents management’s estimate of the\naggregate potential contract value of opportunities under commercial\ndiscussion. It is not backlog, revenue, an executed contract or a binding\ncommitment, is calculated using assumptions as to capacity, term, pricing and\nservice mix that may not be realized, and there can be no assurance that any\nportion of it will result in executed contracts.\n\nThese forward-looking statements are based on management's current\nexpectations, assumptions, estimates and projections about the Company and the\nindustry in which it operates, and involve known and unknown risks,\nuncertainties and other factors that may cause actual results, performance or\nachievements to differ materially from those expressed or implied by any\nforward-looking statement. These risks and uncertainties include, but are not\nlimited to: the ability to convert commercial discussions and negotiations\ninto executed contracts on the expected timeline, the satisfaction of handover\nand other conditions under the Company’s data center agreements, the\nperformance of third-party data center developers and service providers, the\nreceipt of required regulatory, utility and other approvals, customer demand\nand performance, contract terms, equipment delivery schedules, site readiness\nand power availability, electricity tariffs, connected load and other utility\ncharges, data center construction and energization schedules, financing\narrangements and cost of capital, as well as the other risks and uncertainties\ndescribed under “Item 3. Key Information, D. Risk Factors” in the\nCompany’s most recent Annual Report on Form 20-F and in the Company’s\nsubsequent filings filed with, or reports furnished to, the U.S. Securities\nand Exchange Commission on Form 6-K, which are available at www.sec.gov and on\nthe Company's investor relations website.\n\nThese forward-looking statements speak only as of the date of this press\nrelease. The Company undertakes no obligation to update or revise any\nforward-looking statement, whether as a result of new information, future\nevents or otherwise, except as required by applicable law. Investors are\ncautioned not to place undue reliance on forward-looking statements.\n\nInvestor & Media Contacts\n\nInvestor Relations\nTesh Dahya, Head of Investor Relations – tesh.dahya@bitdeer.com\n\nMedia\nEunice Hwangbo, Director, Corporate Communications –\neunice.hwangbo@bitdeer.com\n\n(https://www.globenewswire.com/NewsRoom/AttachmentNg/0fc45a52-37be-4202-a43d-bf494832c8d5)\n\n\n\nGlobeNewswire, Inc. 2026"},"type":"article","timestamp":"2026-10-08T20:30:00.299902056Z","server_sent_at_ms":1791491400299},"received_at":"2026-10-08T20:30:00.449Z","source_url":null},"analysis":{"id":"153299","press_release_id":"164891","analysis_json":{"industry":{"label":"IT Services","sector":"Information Technology"},"redFlags":["No offtake commitments signed for A103 capacity; pipeline figure is management estimate, not backlog or binding contracts"],"eventType":"operations_update","narrative":"Bitdeer AI signed an 8-year data center services agreement for A103, a 60MW AI Cloud facility on its existing Cyberjaya, Malaysia campus, with energization expected in Q1 2028.\n\nThe addition brings Bitdeer's secured AI Cloud capacity to approximately 333.5MW across Malaysia, Norway and the U.S., roughly 95% of its up-to-350MW target for delivery by Q1 2028.\n\nA103 is designed for liquid-cooled rack-scale NVIDIA systems including the next-generation Vera Rubin platform, and management estimates its active AI Cloud capacity pipeline exceeds $10 billion, though no offtake commitments for A103 have been signed yet.","sentiment":"bullish","agentHooks":{"shouldPost":true,"suggestedAngle":"Bitdeer hits 95% of its 350MW capacity target with the 60MW A103 deal, but unmonetized capacity remains a watch item."},"keyFigures":{"customDimensions":{"energization":"Q1 2028","pct_of_target":"95%","pipeline_value":"$10 billion","new_capacity_mw":60,"target_capacity_mw":350,"secured_capacity_mw":333.5,"agreement_term_years":8,"cyberjaya_campus_capacity_mw":71.5}},"quotedText":"We have secured approximately 95% of our up-to-350MW target with the addition of the A103 facility","namedEntities":{"people":[{"name":"Michael G. Potter","role":"CFO of Bitdeer Technologies Group"},{"name":"Tesh Dahya","role":"Head of Investor Relations"},{"name":"Eunice Hwangbo","role":"Director, Corporate Communications"}],"products":["NVIDIA Vera Rubin platform","GPU Cloud","Model Studio","AI Agent Builder"],"companies":[{"name":"Bitdeer Technologies Group","ticker":"BTDR","relationship":"filer"},{"name":"Bitdeer AI","relationship":"subsidiary/division of filer"},{"name":"NVIDIA","relationship":"technology partner"}],"dollarAmounts":[{"amount":"$10 billion","context":"estimated active pipeline for AI Cloud capacity (not backlog or binding)"}]},"materialImpact":{"score":3,"reasoning":"An 8-year, 60MW data center services agreement brings Bitdeer to ~95% of its 350MW capacity target, a material operational milestone. However, no offtake commitments for A103 are signed yet, limiting near-term revenue certainty."},"tickerRelevance":{"others":[],"primary":"BTDR"},"globalImportance":38,"audienceRelevance":40,"eventTypeSecondary":["partnership"],"importanceComponents":{"tickerTier":"mid/small-cap","offtakeRisk":"no signed offtake for A103","eventGravity":"capacity-expansion-milestone","retailFavoriteBoost":"moderate — crypto/AI-infrastructure retail following"}},"event_type":"operations_update","event_type_secondary":["partnership"],"sentiment":"bullish","material_impact_score":3,"narrative":"Bitdeer AI signed an 8-year data center services agreement for A103, a 60MW AI Cloud facility on its existing Cyberjaya, Malaysia campus, with energization expected in Q1 2028.\n\nThe addition brings Bitdeer's secured AI Cloud capacity to approximately 333.5MW across Malaysia, Norway and the U.S., roughly 95% of its up-to-350MW target for delivery by Q1 2028.\n\nA103 is designed for liquid-cooled rack-scale NVIDIA systems including the next-generation Vera Rubin platform, and management estimates its active AI Cloud capacity pipeline exceeds $10 billion, though no offtake commitments for A103 have been signed yet.","key_figures":{"customDimensions":{"energization":"Q1 2028","pct_of_target":"95%","pipeline_value":"$10 billion","new_capacity_mw":60,"target_capacity_mw":350,"secured_capacity_mw":333.5,"agreement_term_years":8,"cyberjaya_campus_capacity_mw":71.5}},"named_entities":{"people":[{"name":"Michael G. Potter","role":"CFO of Bitdeer Technologies Group"},{"name":"Tesh Dahya","role":"Head of Investor Relations"},{"name":"Eunice Hwangbo","role":"Director, Corporate Communications"}],"products":["NVIDIA Vera Rubin platform","GPU Cloud","Model Studio","AI Agent Builder"],"companies":[{"name":"Bitdeer Technologies Group","ticker":"BTDR","relationship":"filer"},{"name":"Bitdeer AI","relationship":"subsidiary/division of filer"},{"name":"NVIDIA","relationship":"technology partner"}],"dollarAmounts":[{"amount":"$10 billion","context":"estimated active pipeline for AI Cloud capacity (not backlog or binding)"}]},"model_name":"glm-5.3-flashx","prompt_hash":"sha256:5c812bd9e28b810d","schema_hash":"sha256:05005c02d9cffac9","created_at":"2026-10-08T20:30:06.425Z","global_importance":38,"audience_relevance":40,"importance_components":{"tickerTier":"mid/small-cap","offtakeRisk":"no signed offtake for A103","eventGravity":"capacity-expansion-milestone","retailFavoriteBoost":"moderate — crypto/AI-infrastructure retail following"}},"durationMs":5923,"modelName":"glm-5.3-flashx"}}