{"success":true,"data":{"pressRelease":{"id":"16860","rtpr_id":"nNFC7FQdKk","ticker":"RLYG","exchange":"","all_tickers":["RLYG"],"title":"Riley Gold Files PWC Gold Project NI 43-101 Technical Report","author":"Newsfile Corp","published_at":"2026-05-01T11:30:21.919Z","article_body":"Vancouver, British Columbia--(Newsfile Corp. - May 1, 2026) - Riley Gold Corp.\n(TSXV: RLYG) (OTCQB: RLYGF) (\"Riley Gold\" or the \"Company\") is pleased to\nannounce that the Company has filed a National Instrument 43-101 Standards of\nDisclosure for Mineral Projects (\"NI 43-101\") technical report for Riley\nGold's 100% owned Pipeline West/Clipper Gold Project (\"PWC\"), entitled \"NI\n43-101 Technical Report, Pipeline West/Clipper Property, Lander County,\nNevada, U.S.A\" dated April 29, 2026, with an effective date of February 11,\n2026 (the \"Technical Report\"). The Technical Report is available under the\nCompany's SEDAR+ profile at sedarplus.ca\n(https://api.newsfilecorp.com/redirect/ejgQkfM3W7).\n\nPWC is located in the Cortez mining district of the Battle Mountain - Eureka\nTrend. PWC is operated by Kinross Gold U.S.A., Inc. (\"Kinross\"), a wholly\nowned subsidiary of Kinross Gold Corporation (TSX: K, NYSE: KGC), under an\nexploration earn-in agreement executed in March 2024.\n\nThe Technical Report was prepared by Matthew Dumula, P. Eng. of Archer Cathro\nGeological (US) Ltd., who is a \"Qualified Person\" as defined under NI 43-101\nand independent of Riley Gold.\n\nThe Technical Report provides an initial overview, including exploration\nactivities to date. Kinross, as operator, continues to conduct additional\nexploration activities at PWC.\n\nAbout PWC:\n\nPWC constitutes a prospective exploration property for Carlin-type,\ndisseminated and replacement gold deposits. PWC consists of a land package\ntotaling approximately 27.2 km² of unpatented mining claims and patented fee\nlands adjoining NGM. PWC is situated along the Cortez structural zone of the\nexceptionally productive Cortez Trend within the Battle Mountain - Eureka\nTrend in north central Nevada (Figure 1). The Cortez and Pipeline complexes\n(adjoining Riley Gold's PWC boundary) are top producers within Nevada, a state\nthat consistently produced between 4-5 million ounces of gold a year.\n\n(https://images.newsfilecorp.com/files/10015/295270_06aee6d2e4a099cd_002full.jpg)\n\nFigure 1. PWC project location in the Cortez district\n\nTo view an enhanced version of this graphic, please visit:\nhttps://images.newsfilecorp.com/files/10015/295270_06aee6d2e4a099cd_002full.jpg\n\nAbout Riley Gold Corp.\n\nRiley Gold is an exploration and development company focused in Nevada, USA,\nwith assets located in the Battle Mountain Eureka Trend (within the Cortez\nDistrict) and the Walker Lane Trend. Riley Gold's founders and leadership team\nhave a proven track record of maximizing shareholder value during each phase\nof the mining life cycle: exploration, development, and production.\n\nFOR FURTHER INFORMATION, PLEASE CONTACT:\n\nTodd Hilditch\nChief Executive Officer\nTel: (604) 443-3831\n\nNeither the TSX Venture Exchange nor its Regulation Services Provider (as that\nterm is defined in the policies of the TSX Venture Exchange) accepts\nresponsibility for the adequacy or accuracy of this release.\n\n\nTo view the source version of this press release, please visit\nhttps://www.newsfilecorp.com/release/295270","article_body_html":"","raw_payload":{"data":{"id":"nNFC7FQdKk","title":"Riley Gold Files PWC Gold Project NI 43-101 Technical Report","author":"Newsfile Corp","ticker":"RLYG","created":"2026-05-01T11:30:21.919Z","tickers":["RLYG"],"exchange":"","article_body":"Vancouver, British Columbia--(Newsfile Corp. - May 1, 2026) - Riley Gold Corp.\n(TSXV: RLYG) (OTCQB: RLYGF) (\"Riley Gold\" or the \"Company\") is pleased to\nannounce that the Company has filed a National Instrument 43-101 Standards of\nDisclosure for Mineral Projects (\"NI 43-101\") technical report for Riley\nGold's 100% owned Pipeline West/Clipper Gold Project (\"PWC\"), entitled \"NI\n43-101 Technical Report, Pipeline West/Clipper Property, Lander County,\nNevada, U.S.A\" dated April 29, 2026, with an effective date of February 11,\n2026 (the \"Technical Report\"). The Technical Report is available under the\nCompany's SEDAR+ profile at sedarplus.ca\n(https://api.newsfilecorp.com/redirect/ejgQkfM3W7).\n\nPWC is located in the Cortez mining district of the Battle Mountain - Eureka\nTrend. PWC is operated by Kinross Gold U.S.A., Inc. (\"Kinross\"), a wholly\nowned subsidiary of Kinross Gold Corporation (TSX: K, NYSE: KGC), under an\nexploration earn-in agreement executed in March 2024.\n\nThe Technical Report was prepared by Matthew Dumula, P. Eng. of Archer Cathro\nGeological (US) Ltd., who is a \"Qualified Person\" as defined under NI 43-101\nand independent of Riley Gold.\n\nThe Technical Report provides an initial overview, including exploration\nactivities to date. Kinross, as operator, continues to conduct additional\nexploration activities at PWC.\n\nAbout PWC:\n\nPWC constitutes a prospective exploration property for Carlin-type,\ndisseminated and replacement gold deposits. PWC consists of a land package\ntotaling approximately 27.2 km² of unpatented mining claims and patented fee\nlands adjoining NGM. PWC is situated along the Cortez structural zone of the\nexceptionally productive Cortez Trend within the Battle Mountain - Eureka\nTrend in north central Nevada (Figure 1). The Cortez and Pipeline complexes\n(adjoining Riley Gold's PWC boundary) are top producers within Nevada, a state\nthat consistently produced between 4-5 million ounces of gold a year.\n\n(https://images.newsfilecorp.com/files/10015/295270_06aee6d2e4a099cd_002full.jpg)\n\nFigure 1. PWC project location in the Cortez district\n\nTo view an enhanced version of this graphic, please visit:\nhttps://images.newsfilecorp.com/files/10015/295270_06aee6d2e4a099cd_002full.jpg\n\nAbout Riley Gold Corp.\n\nRiley Gold is an exploration and development company focused in Nevada, USA,\nwith assets located in the Battle Mountain Eureka Trend (within the Cortez\nDistrict) and the Walker Lane Trend. Riley Gold's founders and leadership team\nhave a proven track record of maximizing shareholder value during each phase\nof the mining life cycle: exploration, development, and production.\n\nFOR FURTHER INFORMATION, PLEASE CONTACT:\n\nTodd Hilditch\nChief Executive Officer\nTel: (604) 443-3831\n\nNeither the TSX Venture Exchange nor its Regulation Services Provider (as that\nterm is defined in the policies of the TSX Venture Exchange) accepts\nresponsibility for the adequacy or accuracy of this release.\n\n\nTo view the source version of this press release, please visit\nhttps://www.newsfilecorp.com/release/295270"},"type":"article","timestamp":"2026-05-01T11:30:21.956872766Z","server_sent_at_ms":1777635021956},"received_at":"2026-05-01T11:30:22.007Z","source_url":"https://www.newsfilecorp.com/release/295270"},"analysis":{"id":"12499","press_release_id":"16860","analysis_json":{"industry":{"label":"Materials","sector":"Materials"},"redFlags":[],"eventType":"other","narrative":"Riley Gold filed an NI 43-101 technical report for its 100% owned PWC Gold Project located in Nevada's Cortez mining district.\n\nThe project is operated by Kinross Gold under an exploration earn-in agreement executed in March 2024, covering a 27.2 km² land package.\n\nPrepared by independent qualified person Matthew Dumula, the report provides an initial overview and details exploration activities to date.","sentiment":"bullish","agentHooks":{"shouldPost":false,"suggestedAngle":"Routine 43-101 technical report filed for Kinross-operated PWC project."},"keyFigures":{"customDimensions":{"property_size_km2":27.2}},"quotedText":"The Technical Report provides an initial overview, including exploration activities to date.","namedEntities":{"people":[{"name":"Todd Hilditch","role":"Chief Executive Officer"},{"name":"Matthew Dumula","role":"P. Eng., Archer Cathro Geological (US) Ltd."}],"products":["Pipeline West/Clipper Gold Project","PWC"],"companies":[{"name":"Riley Gold Corp.","ticker":"RLYG"},{"name":"Kinross Gold U.S.A., Inc.","relationship":"operator"},{"name":"Kinross Gold Corporation","ticker":"K","relationship":"partner"},{"name":"Kinross Gold Corporation","ticker":"KGC","relationship":"partner"},{"name":"Archer Cathro Geological (US) Ltd.","relationship":"report author"},{"name":"NGM","relationship":"neighbor"}],"dollarAmounts":[]},"materialImpact":{"score":2,"reasoning":"Routine filing of an NI 43-101 technical report for an exploration project. While the involvement of Kinross as operator under an earn-in agreement is a positive validation, the report itself only provides an initial overview without resource estimates or economic results."},"tickerRelevance":{"others":[{"ticker":"K","relevance":"partner"},{"ticker":"KGC","relevance":"partner"}],"primary":"RLYG"},"globalImportance":12,"audienceRelevance":10,"eventTypeSecondary":["partnership"],"importanceComponents":{"tickerTier":"micro-cap","eventGravity":"operational_update","partnerValidation":true}},"event_type":"other","event_type_secondary":["partnership"],"sentiment":"bullish","material_impact_score":2,"narrative":"Riley Gold filed an NI 43-101 technical report for its 100% owned PWC Gold Project located in Nevada's Cortez mining district.\n\nThe project is operated by Kinross Gold under an exploration earn-in agreement executed in March 2024, covering a 27.2 km² land package.\n\nPrepared by independent qualified person Matthew Dumula, the report provides an initial overview and details exploration activities to date.","key_figures":{"customDimensions":{"property_size_km2":27.2}},"named_entities":{"people":[{"name":"Todd Hilditch","role":"Chief Executive Officer"},{"name":"Matthew Dumula","role":"P. Eng., Archer Cathro Geological (US) Ltd."}],"products":["Pipeline West/Clipper Gold Project","PWC"],"companies":[{"name":"Riley Gold Corp.","ticker":"RLYG"},{"name":"Kinross Gold U.S.A., Inc.","relationship":"operator"},{"name":"Kinross Gold Corporation","ticker":"K","relationship":"partner"},{"name":"Kinross Gold Corporation","ticker":"KGC","relationship":"partner"},{"name":"Archer Cathro Geological (US) Ltd.","relationship":"report author"},{"name":"NGM","relationship":"neighbor"}],"dollarAmounts":[]},"model_name":"glm-4.7","prompt_hash":"sha256:a2703c5a1b5285fe","schema_hash":"sha256:1f8af1196c7db48c","created_at":"2026-05-01T11:57:11.125Z","global_importance":12,"audience_relevance":10,"importance_components":{"tickerTier":"micro-cap","eventGravity":"operational_update","partnerValidation":true}},"durationMs":94860,"modelName":"glm-4.7"}}