{"success":true,"data":{"pressRelease":{"id":"169033","rtpr_id":"nBw2565SMa-20261014","ticker":"CW","exchange":"NYSE","all_tickers":["CW"],"title":"Curtiss-Wright Installs Stage 1 Simulator at TerraPower’s Natrium Site in Kemmerer, WY","author":"Business Wire","published_at":"2026-10-14T13:00:02.379Z","article_body":"Curtiss-Wright Installs Stage 1 Simulator at TerraPower’s Natrium Site in\nKemmerer, WY\n\nCutting-Edge Simulation Technology Supports Growth in Advanced Nuclear\nReactors\n\nCurtiss-Wright today announced that it has delivered and completed\ninstallation of the Stage 1 Training Simulator (TSN) at TerraPower’s Natrium\nsite in Kemmerer, Wyoming. The TSN is a full-scope simulator that will\nreplicate plant equipment and simulate system conditions and operations to\nsupport operator training and licensing. It is built on Curtiss-Wright’s\n3KEYMASTER™ simulation software—a real-time, high-fidelity simulation and\nanalysis platform with an extensive installed base in nuclear, power, and\nprocess facilities.\n\n“Curtiss-Wright is pleased to announce the successful development and\ninstallation of the Natrium Training Simulator at the Kemmerer site,” said\nLynn M. Bamford, Chair and CEO of Curtiss-Wright Corporation. “This is a key\nmilestone in our collaboration with TerraPower that exemplifies our ability to\nleverage Curtiss-Wright’s advanced technologies, domain expertise, and\nengineering leadership to meet the needs of next-generation nuclear reactors.\nAs a leading global supplier of nuclear reactor technologies, Curtiss-Wright\nis well positioned to support the anticipated acceleration in demand for\nadvanced reactors and continued expansion of the U.S. reactor fleet.”\n\n“Building the world’s most advanced reactor demands an equally advanced\napproach to operator training,” said George Piccard, Vice President Plant\nOperations at TerraPower. “By working with Curtiss-Wright to deliver the\nNatrium Training Simulator, we are laying the foundation to scale a qualified\nnuclear workforce across every future Natrium plant and ensuring our operators\nare fully prepared long before the plant comes online.”\n\nUnder previously awarded contracts, Curtiss-Wright will also be developing the\nDistributed Control Systems (DCS) and the Reactor Protection System (RPS) for\nthe Natrium plant. The Natrium plant design features a 345-megawatt\nsodium-cooled fast reactor with a patented molten salt-based energy storage\nsystem. The storage technology can boost the system’s output to\n500-megawatts of power when needed as it is designed to keep base output\nsteady, ensuring constant reliability, and can quickly ramp up when demand\npeaks—it is the only advanced reactor design with this unique feature.\nKemmerer Unit 1 is expected to be the first utility-scale advanced nuclear\npower plant.\n\nCurtiss-Wright maintains one of the most comprehensive and diverse portfolios\nof advanced nuclear power equipment, technology, and services globally to\nsupport both operating reactors and new build opportunities. Curtiss-Wright\nperformed the work within its Nuclear Division in the Naval & Power\nsegment. For more information about our nuclear reactor technologies\nsupporting advanced nuclear reactors, please visit nuclear.curtisswright.com\n(https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fcw-my.sharepoint.us%2Fpersonal%2Fcsaunders_curtisswright_com%2FDocuments%2FCarolyn%2520Saunders%2FPress%2520Releases%2F2026%2F08%2520August%25202026%2520TerraPower%2520Nuclear%2Fnuclear.curtisswright.com&esheet=54621773&newsitemid=20261014305872&lan=en-US&anchor=nuclear.curtisswright.com&index=1&md5=6d55410e5ab28e8b58b0260a8dc67b5a)\n.\n\nAbout Curtiss-Wright Corporation\n\nCurtiss-Wright Corporation (NYSE: CW) is a global integrated business that\nprovides highly engineered products, solutions and services mainly to\nAerospace & Defense markets, as well as critical technologies in demanding\nCommercial Nuclear Power, Process and Industrial markets. We leverage a\nworkforce of approximately 9,300 highly skilled employees who develop, design\nand build what we believe are the best engineered solutions to the markets we\nserve. Building on the heritage of Glenn Curtiss and the Wright brothers,\nCurtiss-Wright has a long tradition of providing innovative solutions through\ntrusted customer relationships. For more information, visit\nwww.curtisswright.com\n(https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.curtisswright.com&esheet=54621773&newsitemid=20261014305872&lan=en-US&anchor=www.curtisswright.com&index=2&md5=29b21f36e3e851957c23e18e9e6ad1a9)\n.\n\nThis press release contains forward-looking statements made pursuant to the\nSafe Harbor provisions of the Private Securities Litigation Reform Act of\n1995. Such statements, including statements relating to Curtiss-Wright\nCorporation's expectations of future performance of our Training Simulator and\nDistributed Control Systems, the continued relationships with existing\ncustomers, the successful implementation and overall success of these\nproducts, successful development of the Natrium(®) advanced nuclear reactor\ndesign and future opportunities associated with this nuclear reactor design,\nare not considered historical facts and are considered forward-looking\nstatements under the federal securities laws. Such forward-looking statements\nare subject to certain risks and uncertainties that could cause actual results\nto differ materially from those expressed or implied. Readers are cautioned\nnot to place undue reliance on these forward-looking statements, which speak\nonly as of the date hereof. Such risks and uncertainties include, but are not\nlimited to: a reduction in anticipated orders; an economic downturn; changes\nin competitive marketplace and/or customer requirements; a change in US and\nForeign government spending; an inability to perform customer contracts at\nanticipated cost levels; and other factors that generally affect the business\nof aerospace, defense contracting, marine, electronics and industrial\ncompanies. Please refer to the Company's current SEC filings under the\nSecurities Exchange Act of 1934, as amended, for further information.\n\n\n\nView source version on businesswire.com:\nhttps://www.businesswire.com/news/home/20261014305872/en/\n(https://www.businesswire.com/news/home/20261014305872/en/)\n\nJim Ryan\n\n(704) 869-4621\n\njim.ryan@curtisswright.com (mailto:jim.ryan@curtisswright.com)\n\n\nCopyright Business Wire 2026","article_body_html":"","raw_payload":{"data":{"id":"nBw2565SMa-20261014","title":"Curtiss-Wright Installs Stage 1 Simulator at TerraPower’s Natrium Site in Kemmerer, WY","author":"Business Wire","ticker":"CW","created":"2026-10-14T13:00:02.379Z","tickers":["CW"],"exchange":"NYSE","article_body":"Curtiss-Wright Installs Stage 1 Simulator at TerraPower’s Natrium Site in\nKemmerer, WY\n\nCutting-Edge Simulation Technology Supports Growth in Advanced Nuclear\nReactors\n\nCurtiss-Wright today announced that it has delivered and completed\ninstallation of the Stage 1 Training Simulator (TSN) at TerraPower’s Natrium\nsite in Kemmerer, Wyoming. The TSN is a full-scope simulator that will\nreplicate plant equipment and simulate system conditions and operations to\nsupport operator training and licensing. It is built on Curtiss-Wright’s\n3KEYMASTER™ simulation software—a real-time, high-fidelity simulation and\nanalysis platform with an extensive installed base in nuclear, power, and\nprocess facilities.\n\n“Curtiss-Wright is pleased to announce the successful development and\ninstallation of the Natrium Training Simulator at the Kemmerer site,” said\nLynn M. Bamford, Chair and CEO of Curtiss-Wright Corporation. “This is a key\nmilestone in our collaboration with TerraPower that exemplifies our ability to\nleverage Curtiss-Wright’s advanced technologies, domain expertise, and\nengineering leadership to meet the needs of next-generation nuclear reactors.\nAs a leading global supplier of nuclear reactor technologies, Curtiss-Wright\nis well positioned to support the anticipated acceleration in demand for\nadvanced reactors and continued expansion of the U.S. reactor fleet.”\n\n“Building the world’s most advanced reactor demands an equally advanced\napproach to operator training,” said George Piccard, Vice President Plant\nOperations at TerraPower. “By working with Curtiss-Wright to deliver the\nNatrium Training Simulator, we are laying the foundation to scale a qualified\nnuclear workforce across every future Natrium plant and ensuring our operators\nare fully prepared long before the plant comes online.”\n\nUnder previously awarded contracts, Curtiss-Wright will also be developing the\nDistributed Control Systems (DCS) and the Reactor Protection System (RPS) for\nthe Natrium plant. The Natrium plant design features a 345-megawatt\nsodium-cooled fast reactor with a patented molten salt-based energy storage\nsystem. The storage technology can boost the system’s output to\n500-megawatts of power when needed as it is designed to keep base output\nsteady, ensuring constant reliability, and can quickly ramp up when demand\npeaks—it is the only advanced reactor design with this unique feature.\nKemmerer Unit 1 is expected to be the first utility-scale advanced nuclear\npower plant.\n\nCurtiss-Wright maintains one of the most comprehensive and diverse portfolios\nof advanced nuclear power equipment, technology, and services globally to\nsupport both operating reactors and new build opportunities. Curtiss-Wright\nperformed the work within its Nuclear Division in the Naval & Power\nsegment. For more information about our nuclear reactor technologies\nsupporting advanced nuclear reactors, please visit nuclear.curtisswright.com\n(https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fcw-my.sharepoint.us%2Fpersonal%2Fcsaunders_curtisswright_com%2FDocuments%2FCarolyn%2520Saunders%2FPress%2520Releases%2F2026%2F08%2520August%25202026%2520TerraPower%2520Nuclear%2Fnuclear.curtisswright.com&esheet=54621773&newsitemid=20261014305872&lan=en-US&anchor=nuclear.curtisswright.com&index=1&md5=6d55410e5ab28e8b58b0260a8dc67b5a)\n.\n\nAbout Curtiss-Wright Corporation\n\nCurtiss-Wright Corporation (NYSE: CW) is a global integrated business that\nprovides highly engineered products, solutions and services mainly to\nAerospace & Defense markets, as well as critical technologies in demanding\nCommercial Nuclear Power, Process and Industrial markets. We leverage a\nworkforce of approximately 9,300 highly skilled employees who develop, design\nand build what we believe are the best engineered solutions to the markets we\nserve. Building on the heritage of Glenn Curtiss and the Wright brothers,\nCurtiss-Wright has a long tradition of providing innovative solutions through\ntrusted customer relationships. For more information, visit\nwww.curtisswright.com\n(https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.curtisswright.com&esheet=54621773&newsitemid=20261014305872&lan=en-US&anchor=www.curtisswright.com&index=2&md5=29b21f36e3e851957c23e18e9e6ad1a9)\n.\n\nThis press release contains forward-looking statements made pursuant to the\nSafe Harbor provisions of the Private Securities Litigation Reform Act of\n1995. Such statements, including statements relating to Curtiss-Wright\nCorporation's expectations of future performance of our Training Simulator and\nDistributed Control Systems, the continued relationships with existing\ncustomers, the successful implementation and overall success of these\nproducts, successful development of the Natrium(®) advanced nuclear reactor\ndesign and future opportunities associated with this nuclear reactor design,\nare not considered historical facts and are considered forward-looking\nstatements under the federal securities laws. Such forward-looking statements\nare subject to certain risks and uncertainties that could cause actual results\nto differ materially from those expressed or implied. Readers are cautioned\nnot to place undue reliance on these forward-looking statements, which speak\nonly as of the date hereof. Such risks and uncertainties include, but are not\nlimited to: a reduction in anticipated orders; an economic downturn; changes\nin competitive marketplace and/or customer requirements; a change in US and\nForeign government spending; an inability to perform customer contracts at\nanticipated cost levels; and other factors that generally affect the business\nof aerospace, defense contracting, marine, electronics and industrial\ncompanies. Please refer to the Company's current SEC filings under the\nSecurities Exchange Act of 1934, as amended, for further information.\n\n\n\nView source version on businesswire.com:\nhttps://www.businesswire.com/news/home/20261014305872/en/\n(https://www.businesswire.com/news/home/20261014305872/en/)\n\nJim Ryan\n\n(704) 869-4621\n\njim.ryan@curtisswright.com (mailto:jim.ryan@curtisswright.com)\n\n\nCopyright Business Wire 2026"},"type":"article","timestamp":"2026-10-14T13:00:02.771247993Z","server_sent_at_ms":1791982802771},"received_at":"2026-10-14T13:00:02.822Z","source_url":"https://www.businesswire.com/news/home/20261014305872/en/"},"analysis":{"id":"157277","press_release_id":"169033","analysis_json":{"industry":{"label":"Aerospace & Defense","sector":"Industrials"},"redFlags":[],"eventType":"operations_update","narrative":"Curtiss-Wright delivered and installed the Stage 1 full-scope Training Simulator at TerraPower's Natrium site in Kemmerer, Wyoming, built on its 3KEYMASTER simulation platform.\n\nThe simulator supports operator training and licensing for what is expected to be the first utility-scale advanced nuclear plant, a 345 MW sodium-cooled fast reactor that can boost output to 500 MW via molten-salt energy storage.\n\nUnder previously awarded contracts, CW is also supplying the plant's Distributed Control Systems and Reactor Protection System, positioning it as a key supplier to next-generation nuclear.","sentiment":"bullish","agentHooks":{"shouldPost":false,"suggestedAngle":"CW deepens its advanced-nuclear foothold with the Natrium simulator milestone, reinforcing a growing nuclear backlog narrative."},"keyFigures":{"customDimensions":{"natrium_base_output_mw":345,"natrium_boosted_output_mw":500}},"quotedText":"Curtiss-Wright is well positioned to support the anticipated acceleration in demand for advanced reactors and continued expansion of the U.S. reactor fleet.","namedEntities":{"people":[{"name":"Lynn M. Bamford","role":"Chair and CEO of Curtiss-Wright"},{"name":"George Piccard","role":"Vice President Plant Operations, TerraPower"},{"name":"Jim Ryan","role":"press contact"}],"products":["3KEYMASTER","Natrium Training Simulator (TSN)","Distributed Control Systems (DCS)","Reactor Protection System (RPS)"],"companies":[{"name":"Curtiss-Wright Corporation","ticker":"CW","relationship":"filer"},{"name":"TerraPower","relationship":"customer/partner"}],"dollarAmounts":[]},"materialImpact":{"score":2,"reasoning":"Milestone delivery on a previously awarded contract rather than a new order; supports CW's advanced nuclear growth narrative but has no new financial figures."},"tickerRelevance":{"others":[],"primary":"CW"},"globalImportance":25,"audienceRelevance":30,"eventTypeSecondary":["partnership"],"importanceComponents":{"tickerTier":"mid-cap industrial","eventGravity":"contract milestone on existing award, no new revenue","sectorWeight":"advanced nuclear growth theme","householdBrandBoost":0}},"event_type":"operations_update","event_type_secondary":["partnership"],"sentiment":"bullish","material_impact_score":2,"narrative":"Curtiss-Wright delivered and installed the Stage 1 full-scope Training Simulator at TerraPower's Natrium site in Kemmerer, Wyoming, built on its 3KEYMASTER simulation platform.\n\nThe simulator supports operator training and licensing for what is expected to be the first utility-scale advanced nuclear plant, a 345 MW sodium-cooled fast reactor that can boost output to 500 MW via molten-salt energy storage.\n\nUnder previously awarded contracts, CW is also supplying the plant's Distributed Control Systems and Reactor Protection System, positioning it as a key supplier to next-generation nuclear.","key_figures":{"customDimensions":{"natrium_base_output_mw":345,"natrium_boosted_output_mw":500}},"named_entities":{"people":[{"name":"Lynn M. Bamford","role":"Chair and CEO of Curtiss-Wright"},{"name":"George Piccard","role":"Vice President Plant Operations, TerraPower"},{"name":"Jim Ryan","role":"press contact"}],"products":["3KEYMASTER","Natrium Training Simulator (TSN)","Distributed Control Systems (DCS)","Reactor Protection System (RPS)"],"companies":[{"name":"Curtiss-Wright Corporation","ticker":"CW","relationship":"filer"},{"name":"TerraPower","relationship":"customer/partner"}],"dollarAmounts":[]},"model_name":"glm-5.3-flashx","prompt_hash":"sha256:5c812bd9e28b810d","schema_hash":"sha256:05005c02d9cffac9","created_at":"2026-10-14T13:00:16.906Z","global_importance":25,"audience_relevance":30,"importance_components":{"tickerTier":"mid-cap industrial","eventGravity":"contract milestone on existing award, no new revenue","sectorWeight":"advanced nuclear growth theme","householdBrandBoost":0}},"durationMs":5070,"modelName":"glm-5.3-flashx"}}