{"success":true,"data":{"pressRelease":{"id":"26979","rtpr_id":"nPreSW01Ta","ticker":"LUC","exchange":"TSX","all_tickers":["LUC"],"title":"LUCARA ANNOUNCES Q1 2026 RESULTS","author":"PR Newswire","published_at":"2026-05-07T21:37:47.959Z","article_body":"LUCARA ANNOUNCES Q1 2026 RESULTS\nPR Newswire\n\nVANCOUVER, BC, May 7, 2026\n\nVANCOUVER, BC, May 7, 2026 /PRNewswire/ -- (TSX: LUC) (BSE: LUC) (Nasdaq FNGM:\nLUC) PDF Version\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=1197465309&u=https%3A%2F%2Fmma.prnewswire.com%2Fmedia%2F2975377%2FLucara_Diamond_Corp__LUCARA_ANNOUNCES_Q1_2026_RESULTS.pdf&a=PDF+Version)\n\nLucara Diamond Corp. (\"Lucara\" or the \"Company\") today reports its results for\nthe quarter ended March 31, 2026. All amounts are in U.S. dollars unless\notherwise noted. References to \"C$\" are to Canadian dollars.\n\nQ1 2026 HIGHLIGHTS\n\nQ1 2026 marked a transformational quarter for Lucara, with the successful\ncompletion of its equity and bond financings for the Karowe Underground\nProject (the \"UGP\"), strengthening the Company's balance sheet and positioning\nit for long-term value creation.\n\nStrengthened capital structure and liquidity\n* Closed a C$165.0 million equity financing on January 29, 2026, reflecting\nstrong investor support.\n* Successfully issued $350.0 million of senior secured bonds on March 27,\n2026, with a tap option which allows for an additional $50.0 million of\nissuance and an option to establish a revolving credit facility of up to $50.0\nmillion.\n* Fully repaid $220.0 million of project debt.\n* Ended the quarter with a strong cash position of $244.3 million (December\n31, 2025: $31.9 million).\nUGP advancement\n* Updated feasibility study confirms total capital cost of $779.2 million,\nwith $472.4 million already invested, demonstrating significant project\nadvancement.\nOperational resilience and high-value recoveries\n* Recovered 100 Specials(1), including five diamonds greater than 100\ncarats and one exceeding 300 carats.\n* Notable recovery of a 36.92 carat blue Type IIB diamond recovered from the\nrun-of-mine stockpile, comprised of ore previously mined but not yet\nprocessed, reinforcing Karowe's reputation for rare, high-value stones.\n* Continued strong processing performance, with throughput aligned with\noperational expectations.\nContinued strong safety record\n* The Karowe Diamond Mine (\"Karowe\") registered no lost time injuries during\nQ1 2026. The rolling twelve-month Total Recordable Injury Frequency Rate\n(TRIFR) for the Karowe Mine was 0.32 (Q1 2025: 0.36).\nFinancial performance\n* Q1 2026 revenue was $21.8 million (Q1 2025: $30.3 million), reflecting a\nhigher proportion of stockpile processing during the period due to unseasonal\nweather impacting open pit mining. Stockpile material is inherently variable\nin grade and quality, which affected realized recoveries in the quarter. Open\npit mining resumed on March 26, 2026 and is expected to conclude later in the\nyear.\n* Operating cost per tonne processed of $24.74, reflecting disciplined cost\nmanagement despite inflationary pressures and transitional mining activities.\n* Despite lower revenue and higher costs in Q1 2026, the Company is\nmaintaining its full year outlook. Revenue guidance remains unchanged at\n$100.0 million to $130.0 million, supported by the planned return to open pit\nmining, with all other guidance parameters also reaffirmed. \n _______________                                       \n (1)Specials are defined as stones above 10.8 carats.  \n\nWilliam Lamb, President & CEO commented: \"Q1 2026 represents a pivotal\nmilestone for Lucara. The successful execution of our financing strategy for\nthe Karowe Underground Project has strengthened our balance sheet, providing\nthe financial flexibility to advance one of the world's most exceptional\ndiamond assets.\n\nOperationally, Karowe continues to demonstrate its resilience and unique value\nproposition. The recovery of a 36.92 carat blue diamond, alongside multiple\nlarge stones recovered from run-of-mine stockpile material, underscores the\nconsistent delivery of high-quality, premium diamonds that differentiate\nLucara globally.\n\nWhile broader diamond market conditions remain mixed, our focus on large,\nhigh-value stones positions us well to benefit from improving fundamentals in\nthis segment.\n\nWith steady progress on the underground project and continued operational\nexecution, we are well positioned to unlock long-term value for our\nshareholders.\"\n\nKAROWE UNDERGROUND PROJECT UPDATE\n\nThe UGP is designed to access the highest value portion of the Karowe orebody,\nwith initial underground production predominantly from the EM/PK(S)(2) unit.\nThe UGP is expected to extend the mine life to 2038.\n\nThe updated feasibility study announced on January 30, 2026 (link to news\nrelease\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=2743319966&u=https%3A%2F%2Flucaradiamond.com%2Fnewsroom%2Fnews-releases%2Flucara-files-updated-feasibility-study-for-karowe-122930%2F&a=link+to+news+release))\nconfirmed a total cost at completion of $779.2 million, including contingency.\nAs at March 31, 2026, $472.4 million had been incurred, with a further $117.7\nmillion committed but not yet incurred. The study incorporates construction\nprogress, updated exchange rates, inclusion of Legacy(3) stone values, and\nrevisions to hydrogeological and geomechanical models, mine design, mining\nmethod, and scheduling. From H1 2026 to H1 2028, processing will continue\nusing a combination of open pit ore and run-of-mine stockpiled materials,\ncomprising ore previously mined but not yet processed.\n\nThe project has been materially de-risked following completion of shaft\nsinking activities in 2025, including the 776 metre production shaft and 729\nmetre ventilation shaft. The UGP has achieved 2,249 lost-time injury free\ndays, with a project-to-date TRIFR of 0.54, below the target of 0.90, and a\n12-month rolling TRIFR of 0.34.\n\nTotal UGP capital expenditures for Q1 2026 were $19.0 million(4), primarily\nrelated to shaft equipping, lateral development, and surface infrastructure.\n\nDuring Q1 2026, the ventilation shaft advanced approximately 491 metres of\nlateral development across the 310-level(5) and 285-level, bringing total\nlateral development to 1,245 metres, ahead of the planned handover stage to\nthe lateral development contractor. Water intersections encountered were\neffectively managed through targeted grouting. At the production shaft, shaft\nequipping was completed to surface, including installation of guides and\nbuntons, followed by decommissioning of sinking infrastructure and\ncommencement of headgear internal steel changeover works.\n\nThe lateral development contract awarded in Q4 2025, covers all development\nfrom the production shaft to the orebody, including extraction, undercut and\nlong-hole drilling level infrastructure, underground crushing facilities, and\nassociated services. During Q1 2026, the contractor completed its site visit\nand kickoff meeting, with onboarding of key personnel and mobilization\nactivities underway as at March 31, 2026.\n\n ______________________                                                              \n (2)EM/PK(S): Eastern magmatic/pyroclastic kimberlite (south).                       \n (3)Legacy stone refers to rough stones sold for a value greater than $5.0 million.  \n (4)Excludes qualifying borrowing cost capitalized.                                  \n (5)Each level is equivalent to a metre above sea level.                             \n\nSurface infrastructure works continued during the quarter, including civil\nconstruction and procurement of long-lead ventilation fan components.\n\nActivities planned for the UGP in Q2 2026 include the following:\n* Continue with production shaft headgear changeover, including stripping and\ninstallation of permanent steel at remaining headgear levels, and advancing\nbin and chute installation works.\n* Advance lateral development at the 310-level, including side-loading\nconveyor installation and sump completion at the 285-level, and initiation of\n470-level development works for ore pass raiseboring.\n* Complete civil works and commence installation of main surface ventilation\nfans.\n* Continue with operational readiness including advancing staffing plans,\nfinalizing operating procedures, and preparing for operation and maintenance\nof permanent infrastructure.\nOPERATIONS UPDATE\n\nOpen pit mining activities at Karowe were temporarily suspended during the\nfirst quarter due to unseasonal and excessive rainfall, resulting in elevated\nwater levels within the pit. Operations resumed in the open pit on March 26,\n2026. During this period, the Company maintained uninterrupted processing\noperations by utilizing run-of-mine stockpiled material. While this approach\nensures continued throughput, the increased reliance on stockpiles, which are\ngenerally lower in grade and diamond quality, contributed to a softer revenue\nperformance in Q1 2026.\n\nDIAMOND MARKET\n\nThe diamond market remains characterized by near-term pricing pressure in\nmid-range and lower-quality stones due to elevated inventory levels and\ncautious consumer demand, alongside continued competition from lab-grown\ndiamonds. However, prices for larger, high-quality natural diamonds have shown\nsigns of stability, supported by constrained global supply and recent price\nincreases for stones above five carats, as announced by De Beers. Longer-term\nsupply fundamentals remain supportive, with declining production from major\nproducers.\n\nFINANCIAL HIGHLIGHTS – Q1 2026\n\n                                                             Three months ended March 31,        \n In millions of U.S. dollars, except carats sold             2026        2025                    \n                                                                                                 \n Revenues                                                    $ 21.8      $ 30.3                  \n Operating expenses                                          (21.6)      (14.0)                  \n Net loss from operations                                    (14.6)      (0.1)                   \n Loss per share from operations (basic and diluted)          (0.01)      (0.00)                  \n                                                                                                 \n Cash and restricted cash                                    244.3       18.7                    \n CORA (6)                                                    -           50.5                    \n Amounts drawn on WCF                                        -           30.0                    \n Amounts drawn on Project Facility                           -           190.0                   \n Bond payable                                                $ 342.9     $ -                     \n                                                                                                 \n Carats sold                                                 79,744      72,871                  \n                                                                                                 \n                                                                                                 \n\nQUARTERLY SALES RESULTS\n\n                                      Three months ended March 31,      \n In millions of U.S. dollars          2026             2025             \n Sales Channel                                                          \n HB                                   $ 13.6           $ 19.3           \n Tender                               7.2              9.3              \n Clara                                1.0              1.7              \n Total Revenue                        $ 21.8           $ 30.3           \n\nDiamond Sales\n\nDiamonds from Karowe are sold through three sales channels: through a diamond\nsales agreement with HB Trading BV (\"HB\"), through quarterly tenders, and on\nthe Clara Diamond Solutions (\"Clara\") sales platform. \n\nFor the three months ended March 31, 2026, the Company reported revenue of\n$13.6 million from HB, compared to $19.3 million for the same period in 2025.\nRevenue from HB accounted for 62% of total revenue recognized in Q1 2026,\ncompared to 64% in Q1 2025. The decline in HB revenue was driven by both a\nlower volume of carats sold and a lower average price per carat. Revenue from\nHB includes \"top-up\" and \"top-down\" payments, which are made to or from the\nCompany when the final polished diamond sales price differs from the estimated\ninitial polished value. Given the time required to fully monetize a stone\nthrough this process, top-up and top-down payments can introduce variability\ninto HB revenue on a quarter-to-quarter basis.\n\nFor the three months ended March 31, 2026, tender sales totaled $7.2 million\ncompared to $9.3 million in Q1 2025, while Clara sales totaled $1.0 million\ncompared to $1.7 million in Q1 2025. Compared to Q1 2025, a higher volume of\ncarats were sold through tender while fewer were sold through Clara. Average\nprices per carat declined across both channels, with tender prices falling 30%\nand Clara prices falling 24%, reflecting continued pricing pressure on\nmid-range and lower-grade stones amid high industry inventory levels, and\ncautious consumer sentiment.\n\n ____________________              \n (6)Cost Overrun Reserve Account.  \n\nQUARTERLY RESULTS FROM OPERATIONS – KAROWE MINE\n\n                                                              Q1-26    Q4-25    Q3-25    Q2-25    Q1-25    \n Sales                                                                                                     \n Revenues                                         $M          21.8     34.5     51.2     43.7     30.3     \n Carats sold                                      Carats      79,744   101,842  101,422  77,167   72,871   \n                                                                                                           \n Production                                                                                                \n Tonnes mined (ore)                               Tonnes      6,231    312,148  517,155  721,111  390,539  \n Tonnes mined (waste)                             Tonnes      -        -        5,682    55,221   35,288   \n Tonnes processed                                 Tonnes      718,404  705,513  744,753  661,352  676,626  \n Average grade processed ((1))                    cpht ((*))  10.0     12.2     12.8     12.5     13.4     \n Carats recovered ((1))                           Carats      72,061   86,110   95,302   82,555   90,500   \n                                                                                                           \n Costs                                                                                                     \n Operating cost per tonne of ore processed ((2))  $           24.74    32.88    25.65    26.76    23.41    \n                                                                                                           \n Capital Expenditures                                                                                      \n Sustaining                                       $M          1.9      4.8      3.0      2.0      0.5      \n UGP ((3))                                        $M          19.0     20.3     22.7     13.6     19.2     \n\n ((*))  Carats per hundred tonnes                                                                                                                \n ((1))  Average grade processed is from direct processing carats and excludes carats recovered from re-processing historical recovery tailings.  \n ((2))  Operating cost per tonne of ore processed is a non-IFRS measure.                                                                         \n ((3))  Excludes qualifying borrowing cost capitalized.                                                                                          \n\n2026 OUTLOOK\n\nThis section of the news release provides management's production and cost\nestimates for 2026. These are forward-looking statements and subject to the\ncautionary note regarding the risks associated with such statements.\n\n Karowe Diamond Mine                                               2026                   \n In millions of U.S. dollars unless otherwise noted                Full Year              \n Diamond revenue (millions)                                        $100 to $130           \n Diamond sales (thousands of carats)                               340 to 360             \n Diamonds recovered (thousands of carats)                          340 to 360             \n Ore tonnes mined (millions)                                       Up to 0.6              \n Waste tonnes mined (millions)                                     Up to 0.2              \n Ore tonnes processed (millions)                                   2.6 to 2.9             \n Total operating cash costs ((1))(per tonne processed)             $27.50 to $31.00       \n UGP capital expenditure                                           Up to $110 million     \n Sustaining capital expenditure                                    Up to $11.5 million    \n Average exchange rate – Botswana Pula per United States Dollar    14.0                   \n\n ((1))  Operating cash costs are a non-IFRS measure. See \" Non-IFRS Measures \" in the Company's MD&A.  \n\nThe table above reflects the natural variability in the resource, including\nboth recovered grade and diamond quality, which may influence the revenue\nguidance for 2026. In 2026, the Company expects to process 2.6 to 2.9 million\ntonnes of ore primarily from run-of-mine stockpiled materials. The assumptions\nfor carats recovered and sold as well as tonnes of ore processed are\nconsistent with achieved plant performance in recent years. Run-of-mine\nstockpiled material (North, Centre, South Lobe) and life-of-mine stockpiles\nwill provide mill feed until H2 2027 when UGP development ore is scheduled to\nstart replacing stockpiles with high-grade ore from the UGP. Full scale\nunderground production is planned for H1 2028.\n\nIn 2026, capital costs for the UGP are expected to be up to $110 million.\nExpenditures in 2026 will focus predominantly on shaft equipping and advancing\nlateral development. Surface works will focus on the removal of stage and\nropes, headgear change over, and main ventilation fan installation.\n\nSustaining capital is expected to be up to $11.5 million with a focus on the\nreplacement and refurbishment of key asset components and tailings\nadvancement. \n\nRESULTS WEBINAR\n\nThe Company will host a conference call and webinar to discuss the results on\nFriday, May 8, 2026 at 7:00am Pacific.\n\nTo join the webinar please use the following link:\n\nhttps://www.c-meeting.com/web3/joinTo/3YPHBZTQCNB9VF/cnvPRIhuqnIESStbq_1hMg or\nthe phone numbers listed below.\n\n Canada/ USA Toll Free  1-844-763-8274   \n International Toll     +1-647-361-0247  \n\nOn behalf of the Board,\n\nWilliam Lamb\nPresident and Chief Executive Officer\n\nFollow Lucara Diamond on Facebook\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=4129752484&u=https%3A%2F%2Fwww.facebook.com%2FLucaraDiamond%2F&a=Facebook),\nInstagram\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=581810375&u=https%3A%2F%2Fwww.instagram.com%2Flucaradiamond%2F&a=Instagram)\nand LinkedIn\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=4010506356&u=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Flucara-diamond-corp-%2F&a=LinkedIn)\n\nABOUT LUCARA\n\nLucara is a leading independent producer of large exceptional quality Type IIa\ndiamonds from its 100% owned Karowe Diamond Mine in Botswana. Karowe is the\nonly diamond mine in the world to have recovered nine diamonds in excess of\n1,000 carats in weight. The Karowe Mine has been in production since 2012 and\nis the focus of the Company's operations and development activities. Karowe is\ntransitioning from open pit to underground mining with the development of the\nUGP. The UGP is designed to access the highest value portion of the Karowe\norebody. Underground development ore from the UGP is scheduled to begin\nreplacing unprocessed run-of-mine stockpiles in 2027, with full-scale\nunderground production planned for the first half of 2028.\n\nLucara has an experienced board and management team with extensive diamond\ndevelopment and operations expertise. Lucara and its subsidiaries operate\ntransparently and in accordance with international best practices in the areas\nof sustainability, health and safety, environment, and community relations.\nLucara is certified by the Responsible Jewellery Council, complies with the\nKimberley Process, and has adopted the IFC Performance Standards and the World\nBank Group's Environmental, Health and Safety Guidelines for Mining. The\ndevelopment of the UGP adheres to the Equator Principles. Lucara is committed\nto upholding high standards while striving to deliver long-term economic\nbenefits to Botswana and the communities in which the Company operates. \n\nThe information in this release is subject to the disclosure requirements of\nLucara pursuant to the EU Market Abuse Regulation. The Company's certified\nadviser on the Nasdaq First North Growth Market is Bergs Securities AB,\nca@bergssecurities.se, +46 739 49 62 50. This information was submitted for\npublication, through the agency of the contact person set out above, on May 7,\n2026, at 2:30 p.m. Pacific Time.\n\nCAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS\n\nCertain statements made in this news release contain \"forward-looking\ninformation\" and \"forward-looking statements\" as defined in applicable\nsecurities laws. Generally, any statements that express or involve discussions\nwith respect to predictions, expectations, beliefs, plans, projections,\nobjectives, assumptions or future events or performance and often (but not\nalways) using forward-looking terminology such as \"expects\", \"is expected\",\n\"anticipates\", \"believes\", \"plans\", \"projects\", \"estimates\", \"budgets\",\n\"scheduled\", \"forecasts\", \"assumes\", \"intends\", \"strategy\", \"goals\",\n\"objectives\", \"potential\", \"possible\" or variations thereof or stating that\ncertain actions, events, conditions or results \"may\", \"could\", \"would\",\n\"should\", \"might\" or \"will\" be taken, occur or be achieved, or the negative of\nany of these terms and similar expressions) are not statements of historical\nfact and may be forward-looking statements.\n\nForward-looking information and forward-looking statements may include, but\nare not limited to, information or statements with respect to the project\nschedule and capital costs for the UGP, diamond sales projections and outlook\ndisclosure under \"2026 Outlook\", the Company's ability to meet its obligations\nunder the Bond terms, future price stability, supply and demand of rough or\npolished diamonds, estimated capital costs, the focus of future expenditures,\nfuture forecasts of revenue and variable consideration in determining revenue,\nthe outcome of tax assessments and the likelihood of recoverability of tax\npayments made, activities planned for the UGP in Q2, including to finalize\nproduction shaft equipping and headframe modifications, advance lateral\ndevelopment, and continue operational readiness, estimation of mineral\nresources including the determination of the boundary between South Lobe\nM/PK(S) and EM/PK(S) domains due to the significant grade difference between\nthese two domains, cost and timing of the development of deposits and\nestimated future production, currency exchange rates, rates of inflation,\nrequirements for and availability of additional capital, capital expenditures,\noperating costs, production and cost estimates, tax rates, timing of drill\nprograms, government regulation of operations, environmental risks and\ncompliance obligations, limitations on insurance coverage, and geopolitical\nand economic risks affecting the Company's operational viability including\nsanctions, trade restrictions and tariffs, the impact of the growing supply of\nlaboratory grown diamonds on the demand for and pricing of the Company's\nnatural diamond production, and the risk that continued expansion in\nlaboratory grown diamond production and shifts in consumer preferences could\nfurther adversely impact revenues achievable by the Company, the ability of HB\nto perform its obligations, including making timely payments to the Company,\nand the concentration of credit risk associated with HB representing a\nsignificant proportion of the Company's total revenue, that carat production\nand revenues from the processing of run-of-mine ore stockpiles will be\nsufficient to support the Company's operations and liquidity requirements\nduring the period prior to the achievement of commercial production from the\nUGP, and the ability of key contractors, including the lateral development\ncontractor, to perform their obligations under their respective agreements in\nthe manner and timeframe contracted for, and the risk that any failure or\ndelay in contractor performance could result in material delays to the UGP and\nincreased project costs.\n\nWhile these factors and assumptions are considered reasonable by the Company\nas at the date of this news release in light of management's experience and\nperception of current conditions and expected developments, these statements\nare inherently subject to significant business, economic and competitive\nuncertainties and contingencies. Known and unknown factors could cause actual\nresults to differ materially from those projected in the forward-looking\ninformation and undue reliance should not be placed on such information. Such\nfactors include, but are not limited to: the timing, scope and cost of\nadditional grouting events at the UGP, the Company's ability to comply with\nthe terms and covenants of the Bonds, the consequences of any defaults under\nthe Bonds including the potential enforcement of security granted to\nbondholders over the assets of the Company and its subsidiaries, that expected\ncash flow from operations, combined with external financing will be sufficient\nto complete construction of the UGP, credit risk, price risk, that the\nestimated timelines to achieve mine ramp up and full production from the UGP\ncan be achieved, that sufficient run-of-mine stockpiled ore of sufficient\ngrade and value will be available to generate revenue prior to the achievement\nof commercial production from the UGP, the economic potential of a mineralized\narea, the size and tonnage of a mineralized area, anticipated sample grades or\nbulk sample diamond content, expectations that the UGP and the pit steepening\nproject will extend mine life, forecasts of additional revenues, future\nproduction activity, that depletion and amortization expense on assets will be\naffected by both the volume of carats recovered in any given period and the\nreserves that are expected to be recovered, the future price and demand for,\nand supply of, diamonds, expectations regarding the scheduling of activities\nfor the UGP.\n\nForward-looking information and statements are based on the opinions and\nestimates of management as of the date such statements are made, and they are\nsubject to several known and unknown risks, uncertainties and other factors\nwhich may cause the actual results, performance or achievements of the Company\nto be materially different from any future results, performance or achievement\nexpressed or implied by such forward-looking statements due to a variety of\nrisks, uncertainties, and other factors, including, without limitation, those\nreferred to in this news release. The foregoing is not exhaustive of the\nfactors that may affect any of our forward-looking statements. The Company\nbelieves that expectations reflected in this forward-looking information are\nreasonable, but no assurance can be given that these expectations will prove\nto be correct. Certain risks which could impact the Company are discussed\nunder the heading \"Risks and Uncertainties\" in the Company's MD&A and in the\nCompany's most recent AIF available at SEDAR+ at www.sedarplus.ca.\n\nAlthough the Company has attempted to identify important factors that could\ncause actual actions, events or results to differ materially from those\ndescribed in forward-looking statements, there may be other factors that cause\nactions, events or results not to be as anticipated, estimated or intended.\nAccordingly, readers and investors should not place undue reliance on\nforward-looking statements. Forward-looking information and statements\ncontained in this news release are made as of the date of this news release\nand accordingly are subject to change after such date. Except as required by\nlaw, the Company disclaims any obligation to revise any forward-looking\ninformation and statements to reflect events or circumstances after the date\nof such information and statements. All forward-looking information and\nstatements contained or incorporated by reference in this news release are\nqualified by the foregoing cautionary statements.\n\nFor further information, please contact: Vancouver: Hannah Reynish, Investor\nRelations & Communications, +1 604 674 0272, info@lucaradiamond.com; Sweden:\nRobert Eriksson, Investor Relations & Public Relations, +46 701 112615,\nreriksson@rive6.ch\n\nView original\ncontent:https://www.prnewswire.co.uk/news-releases/lucara-announces-q1-2026-results-302766309.html\n\n\n\nCopyright (c) 2026 PR Newswire Association,LLC. All Rights Reserved.","article_body_html":"","raw_payload":{"data":{"id":"nPreSW01Ta","title":"LUCARA ANNOUNCES Q1 2026 RESULTS","author":"PR Newswire","ticker":"LUC","created":"2026-05-07T21:37:47.959Z","tickers":["LUC"],"exchange":"TSX","article_body":"LUCARA ANNOUNCES Q1 2026 RESULTS\nPR Newswire\n\nVANCOUVER, BC, May 7, 2026\n\nVANCOUVER, BC, May 7, 2026 /PRNewswire/ -- (TSX: LUC) (BSE: LUC) (Nasdaq FNGM:\nLUC) PDF Version\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=1197465309&u=https%3A%2F%2Fmma.prnewswire.com%2Fmedia%2F2975377%2FLucara_Diamond_Corp__LUCARA_ANNOUNCES_Q1_2026_RESULTS.pdf&a=PDF+Version)\n\nLucara Diamond Corp. (\"Lucara\" or the \"Company\") today reports its results for\nthe quarter ended March 31, 2026. All amounts are in U.S. dollars unless\notherwise noted. References to \"C$\" are to Canadian dollars.\n\nQ1 2026 HIGHLIGHTS\n\nQ1 2026 marked a transformational quarter for Lucara, with the successful\ncompletion of its equity and bond financings for the Karowe Underground\nProject (the \"UGP\"), strengthening the Company's balance sheet and positioning\nit for long-term value creation.\n\nStrengthened capital structure and liquidity\n* Closed a C$165.0 million equity financing on January 29, 2026, reflecting\nstrong investor support.\n* Successfully issued $350.0 million of senior secured bonds on March 27,\n2026, with a tap option which allows for an additional $50.0 million of\nissuance and an option to establish a revolving credit facility of up to $50.0\nmillion.\n* Fully repaid $220.0 million of project debt.\n* Ended the quarter with a strong cash position of $244.3 million (December\n31, 2025: $31.9 million).\nUGP advancement\n* Updated feasibility study confirms total capital cost of $779.2 million,\nwith $472.4 million already invested, demonstrating significant project\nadvancement.\nOperational resilience and high-value recoveries\n* Recovered 100 Specials(1), including five diamonds greater than 100\ncarats and one exceeding 300 carats.\n* Notable recovery of a 36.92 carat blue Type IIB diamond recovered from the\nrun-of-mine stockpile, comprised of ore previously mined but not yet\nprocessed, reinforcing Karowe's reputation for rare, high-value stones.\n* Continued strong processing performance, with throughput aligned with\noperational expectations.\nContinued strong safety record\n* The Karowe Diamond Mine (\"Karowe\") registered no lost time injuries during\nQ1 2026. The rolling twelve-month Total Recordable Injury Frequency Rate\n(TRIFR) for the Karowe Mine was 0.32 (Q1 2025: 0.36).\nFinancial performance\n* Q1 2026 revenue was $21.8 million (Q1 2025: $30.3 million), reflecting a\nhigher proportion of stockpile processing during the period due to unseasonal\nweather impacting open pit mining. Stockpile material is inherently variable\nin grade and quality, which affected realized recoveries in the quarter. Open\npit mining resumed on March 26, 2026 and is expected to conclude later in the\nyear.\n* Operating cost per tonne processed of $24.74, reflecting disciplined cost\nmanagement despite inflationary pressures and transitional mining activities.\n* Despite lower revenue and higher costs in Q1 2026, the Company is\nmaintaining its full year outlook. Revenue guidance remains unchanged at\n$100.0 million to $130.0 million, supported by the planned return to open pit\nmining, with all other guidance parameters also reaffirmed. \n _______________                                       \n (1)Specials are defined as stones above 10.8 carats.  \n\nWilliam Lamb, President & CEO commented: \"Q1 2026 represents a pivotal\nmilestone for Lucara. The successful execution of our financing strategy for\nthe Karowe Underground Project has strengthened our balance sheet, providing\nthe financial flexibility to advance one of the world's most exceptional\ndiamond assets.\n\nOperationally, Karowe continues to demonstrate its resilience and unique value\nproposition. The recovery of a 36.92 carat blue diamond, alongside multiple\nlarge stones recovered from run-of-mine stockpile material, underscores the\nconsistent delivery of high-quality, premium diamonds that differentiate\nLucara globally.\n\nWhile broader diamond market conditions remain mixed, our focus on large,\nhigh-value stones positions us well to benefit from improving fundamentals in\nthis segment.\n\nWith steady progress on the underground project and continued operational\nexecution, we are well positioned to unlock long-term value for our\nshareholders.\"\n\nKAROWE UNDERGROUND PROJECT UPDATE\n\nThe UGP is designed to access the highest value portion of the Karowe orebody,\nwith initial underground production predominantly from the EM/PK(S)(2) unit.\nThe UGP is expected to extend the mine life to 2038.\n\nThe updated feasibility study announced on January 30, 2026 (link to news\nrelease\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=2743319966&u=https%3A%2F%2Flucaradiamond.com%2Fnewsroom%2Fnews-releases%2Flucara-files-updated-feasibility-study-for-karowe-122930%2F&a=link+to+news+release))\nconfirmed a total cost at completion of $779.2 million, including contingency.\nAs at March 31, 2026, $472.4 million had been incurred, with a further $117.7\nmillion committed but not yet incurred. The study incorporates construction\nprogress, updated exchange rates, inclusion of Legacy(3) stone values, and\nrevisions to hydrogeological and geomechanical models, mine design, mining\nmethod, and scheduling. From H1 2026 to H1 2028, processing will continue\nusing a combination of open pit ore and run-of-mine stockpiled materials,\ncomprising ore previously mined but not yet processed.\n\nThe project has been materially de-risked following completion of shaft\nsinking activities in 2025, including the 776 metre production shaft and 729\nmetre ventilation shaft. The UGP has achieved 2,249 lost-time injury free\ndays, with a project-to-date TRIFR of 0.54, below the target of 0.90, and a\n12-month rolling TRIFR of 0.34.\n\nTotal UGP capital expenditures for Q1 2026 were $19.0 million(4), primarily\nrelated to shaft equipping, lateral development, and surface infrastructure.\n\nDuring Q1 2026, the ventilation shaft advanced approximately 491 metres of\nlateral development across the 310-level(5) and 285-level, bringing total\nlateral development to 1,245 metres, ahead of the planned handover stage to\nthe lateral development contractor. Water intersections encountered were\neffectively managed through targeted grouting. At the production shaft, shaft\nequipping was completed to surface, including installation of guides and\nbuntons, followed by decommissioning of sinking infrastructure and\ncommencement of headgear internal steel changeover works.\n\nThe lateral development contract awarded in Q4 2025, covers all development\nfrom the production shaft to the orebody, including extraction, undercut and\nlong-hole drilling level infrastructure, underground crushing facilities, and\nassociated services. During Q1 2026, the contractor completed its site visit\nand kickoff meeting, with onboarding of key personnel and mobilization\nactivities underway as at March 31, 2026.\n\n ______________________                                                              \n (2)EM/PK(S): Eastern magmatic/pyroclastic kimberlite (south).                       \n (3)Legacy stone refers to rough stones sold for a value greater than $5.0 million.  \n (4)Excludes qualifying borrowing cost capitalized.                                  \n (5)Each level is equivalent to a metre above sea level.                             \n\nSurface infrastructure works continued during the quarter, including civil\nconstruction and procurement of long-lead ventilation fan components.\n\nActivities planned for the UGP in Q2 2026 include the following:\n* Continue with production shaft headgear changeover, including stripping and\ninstallation of permanent steel at remaining headgear levels, and advancing\nbin and chute installation works.\n* Advance lateral development at the 310-level, including side-loading\nconveyor installation and sump completion at the 285-level, and initiation of\n470-level development works for ore pass raiseboring.\n* Complete civil works and commence installation of main surface ventilation\nfans.\n* Continue with operational readiness including advancing staffing plans,\nfinalizing operating procedures, and preparing for operation and maintenance\nof permanent infrastructure.\nOPERATIONS UPDATE\n\nOpen pit mining activities at Karowe were temporarily suspended during the\nfirst quarter due to unseasonal and excessive rainfall, resulting in elevated\nwater levels within the pit. Operations resumed in the open pit on March 26,\n2026. During this period, the Company maintained uninterrupted processing\noperations by utilizing run-of-mine stockpiled material. While this approach\nensures continued throughput, the increased reliance on stockpiles, which are\ngenerally lower in grade and diamond quality, contributed to a softer revenue\nperformance in Q1 2026.\n\nDIAMOND MARKET\n\nThe diamond market remains characterized by near-term pricing pressure in\nmid-range and lower-quality stones due to elevated inventory levels and\ncautious consumer demand, alongside continued competition from lab-grown\ndiamonds. However, prices for larger, high-quality natural diamonds have shown\nsigns of stability, supported by constrained global supply and recent price\nincreases for stones above five carats, as announced by De Beers. Longer-term\nsupply fundamentals remain supportive, with declining production from major\nproducers.\n\nFINANCIAL HIGHLIGHTS – Q1 2026\n\n                                                             Three months ended March 31,        \n In millions of U.S. dollars, except carats sold             2026        2025                    \n                                                                                                 \n Revenues                                                    $ 21.8      $ 30.3                  \n Operating expenses                                          (21.6)      (14.0)                  \n Net loss from operations                                    (14.6)      (0.1)                   \n Loss per share from operations (basic and diluted)          (0.01)      (0.00)                  \n                                                                                                 \n Cash and restricted cash                                    244.3       18.7                    \n CORA (6)                                                    -           50.5                    \n Amounts drawn on WCF                                        -           30.0                    \n Amounts drawn on Project Facility                           -           190.0                   \n Bond payable                                                $ 342.9     $ -                     \n                                                                                                 \n Carats sold                                                 79,744      72,871                  \n                                                                                                 \n                                                                                                 \n\nQUARTERLY SALES RESULTS\n\n                                      Three months ended March 31,      \n In millions of U.S. dollars          2026             2025             \n Sales Channel                                                          \n HB                                   $ 13.6           $ 19.3           \n Tender                               7.2              9.3              \n Clara                                1.0              1.7              \n Total Revenue                        $ 21.8           $ 30.3           \n\nDiamond Sales\n\nDiamonds from Karowe are sold through three sales channels: through a diamond\nsales agreement with HB Trading BV (\"HB\"), through quarterly tenders, and on\nthe Clara Diamond Solutions (\"Clara\") sales platform. \n\nFor the three months ended March 31, 2026, the Company reported revenue of\n$13.6 million from HB, compared to $19.3 million for the same period in 2025.\nRevenue from HB accounted for 62% of total revenue recognized in Q1 2026,\ncompared to 64% in Q1 2025. The decline in HB revenue was driven by both a\nlower volume of carats sold and a lower average price per carat. Revenue from\nHB includes \"top-up\" and \"top-down\" payments, which are made to or from the\nCompany when the final polished diamond sales price differs from the estimated\ninitial polished value. Given the time required to fully monetize a stone\nthrough this process, top-up and top-down payments can introduce variability\ninto HB revenue on a quarter-to-quarter basis.\n\nFor the three months ended March 31, 2026, tender sales totaled $7.2 million\ncompared to $9.3 million in Q1 2025, while Clara sales totaled $1.0 million\ncompared to $1.7 million in Q1 2025. Compared to Q1 2025, a higher volume of\ncarats were sold through tender while fewer were sold through Clara. Average\nprices per carat declined across both channels, with tender prices falling 30%\nand Clara prices falling 24%, reflecting continued pricing pressure on\nmid-range and lower-grade stones amid high industry inventory levels, and\ncautious consumer sentiment.\n\n ____________________              \n (6)Cost Overrun Reserve Account.  \n\nQUARTERLY RESULTS FROM OPERATIONS – KAROWE MINE\n\n                                                              Q1-26    Q4-25    Q3-25    Q2-25    Q1-25    \n Sales                                                                                                     \n Revenues                                         $M          21.8     34.5     51.2     43.7     30.3     \n Carats sold                                      Carats      79,744   101,842  101,422  77,167   72,871   \n                                                                                                           \n Production                                                                                                \n Tonnes mined (ore)                               Tonnes      6,231    312,148  517,155  721,111  390,539  \n Tonnes mined (waste)                             Tonnes      -        -        5,682    55,221   35,288   \n Tonnes processed                                 Tonnes      718,404  705,513  744,753  661,352  676,626  \n Average grade processed ((1))                    cpht ((*))  10.0     12.2     12.8     12.5     13.4     \n Carats recovered ((1))                           Carats      72,061   86,110   95,302   82,555   90,500   \n                                                                                                           \n Costs                                                                                                     \n Operating cost per tonne of ore processed ((2))  $           24.74    32.88    25.65    26.76    23.41    \n                                                                                                           \n Capital Expenditures                                                                                      \n Sustaining                                       $M          1.9      4.8      3.0      2.0      0.5      \n UGP ((3))                                        $M          19.0     20.3     22.7     13.6     19.2     \n\n ((*))  Carats per hundred tonnes                                                                                                                \n ((1))  Average grade processed is from direct processing carats and excludes carats recovered from re-processing historical recovery tailings.  \n ((2))  Operating cost per tonne of ore processed is a non-IFRS measure.                                                                         \n ((3))  Excludes qualifying borrowing cost capitalized.                                                                                          \n\n2026 OUTLOOK\n\nThis section of the news release provides management's production and cost\nestimates for 2026. These are forward-looking statements and subject to the\ncautionary note regarding the risks associated with such statements.\n\n Karowe Diamond Mine                                               2026                   \n In millions of U.S. dollars unless otherwise noted                Full Year              \n Diamond revenue (millions)                                        $100 to $130           \n Diamond sales (thousands of carats)                               340 to 360             \n Diamonds recovered (thousands of carats)                          340 to 360             \n Ore tonnes mined (millions)                                       Up to 0.6              \n Waste tonnes mined (millions)                                     Up to 0.2              \n Ore tonnes processed (millions)                                   2.6 to 2.9             \n Total operating cash costs ((1))(per tonne processed)             $27.50 to $31.00       \n UGP capital expenditure                                           Up to $110 million     \n Sustaining capital expenditure                                    Up to $11.5 million    \n Average exchange rate – Botswana Pula per United States Dollar    14.0                   \n\n ((1))  Operating cash costs are a non-IFRS measure. See \" Non-IFRS Measures \" in the Company's MD&A.  \n\nThe table above reflects the natural variability in the resource, including\nboth recovered grade and diamond quality, which may influence the revenue\nguidance for 2026. In 2026, the Company expects to process 2.6 to 2.9 million\ntonnes of ore primarily from run-of-mine stockpiled materials. The assumptions\nfor carats recovered and sold as well as tonnes of ore processed are\nconsistent with achieved plant performance in recent years. Run-of-mine\nstockpiled material (North, Centre, South Lobe) and life-of-mine stockpiles\nwill provide mill feed until H2 2027 when UGP development ore is scheduled to\nstart replacing stockpiles with high-grade ore from the UGP. Full scale\nunderground production is planned for H1 2028.\n\nIn 2026, capital costs for the UGP are expected to be up to $110 million.\nExpenditures in 2026 will focus predominantly on shaft equipping and advancing\nlateral development. Surface works will focus on the removal of stage and\nropes, headgear change over, and main ventilation fan installation.\n\nSustaining capital is expected to be up to $11.5 million with a focus on the\nreplacement and refurbishment of key asset components and tailings\nadvancement. \n\nRESULTS WEBINAR\n\nThe Company will host a conference call and webinar to discuss the results on\nFriday, May 8, 2026 at 7:00am Pacific.\n\nTo join the webinar please use the following link:\n\nhttps://www.c-meeting.com/web3/joinTo/3YPHBZTQCNB9VF/cnvPRIhuqnIESStbq_1hMg or\nthe phone numbers listed below.\n\n Canada/ USA Toll Free  1-844-763-8274   \n International Toll     +1-647-361-0247  \n\nOn behalf of the Board,\n\nWilliam Lamb\nPresident and Chief Executive Officer\n\nFollow Lucara Diamond on Facebook\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=4129752484&u=https%3A%2F%2Fwww.facebook.com%2FLucaraDiamond%2F&a=Facebook),\nInstagram\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=581810375&u=https%3A%2F%2Fwww.instagram.com%2Flucaradiamond%2F&a=Instagram)\nand LinkedIn\n(https://edge.prnewswire.com/c/link/?t=0&l=en&o=4683926-1&h=4010506356&u=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Flucara-diamond-corp-%2F&a=LinkedIn)\n\nABOUT LUCARA\n\nLucara is a leading independent producer of large exceptional quality Type IIa\ndiamonds from its 100% owned Karowe Diamond Mine in Botswana. Karowe is the\nonly diamond mine in the world to have recovered nine diamonds in excess of\n1,000 carats in weight. The Karowe Mine has been in production since 2012 and\nis the focus of the Company's operations and development activities. Karowe is\ntransitioning from open pit to underground mining with the development of the\nUGP. The UGP is designed to access the highest value portion of the Karowe\norebody. Underground development ore from the UGP is scheduled to begin\nreplacing unprocessed run-of-mine stockpiles in 2027, with full-scale\nunderground production planned for the first half of 2028.\n\nLucara has an experienced board and management team with extensive diamond\ndevelopment and operations expertise. Lucara and its subsidiaries operate\ntransparently and in accordance with international best practices in the areas\nof sustainability, health and safety, environment, and community relations.\nLucara is certified by the Responsible Jewellery Council, complies with the\nKimberley Process, and has adopted the IFC Performance Standards and the World\nBank Group's Environmental, Health and Safety Guidelines for Mining. The\ndevelopment of the UGP adheres to the Equator Principles. Lucara is committed\nto upholding high standards while striving to deliver long-term economic\nbenefits to Botswana and the communities in which the Company operates. \n\nThe information in this release is subject to the disclosure requirements of\nLucara pursuant to the EU Market Abuse Regulation. The Company's certified\nadviser on the Nasdaq First North Growth Market is Bergs Securities AB,\nca@bergssecurities.se, +46 739 49 62 50. This information was submitted for\npublication, through the agency of the contact person set out above, on May 7,\n2026, at 2:30 p.m. Pacific Time.\n\nCAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS\n\nCertain statements made in this news release contain \"forward-looking\ninformation\" and \"forward-looking statements\" as defined in applicable\nsecurities laws. Generally, any statements that express or involve discussions\nwith respect to predictions, expectations, beliefs, plans, projections,\nobjectives, assumptions or future events or performance and often (but not\nalways) using forward-looking terminology such as \"expects\", \"is expected\",\n\"anticipates\", \"believes\", \"plans\", \"projects\", \"estimates\", \"budgets\",\n\"scheduled\", \"forecasts\", \"assumes\", \"intends\", \"strategy\", \"goals\",\n\"objectives\", \"potential\", \"possible\" or variations thereof or stating that\ncertain actions, events, conditions or results \"may\", \"could\", \"would\",\n\"should\", \"might\" or \"will\" be taken, occur or be achieved, or the negative of\nany of these terms and similar expressions) are not statements of historical\nfact and may be forward-looking statements.\n\nForward-looking information and forward-looking statements may include, but\nare not limited to, information or statements with respect to the project\nschedule and capital costs for the UGP, diamond sales projections and outlook\ndisclosure under \"2026 Outlook\", the Company's ability to meet its obligations\nunder the Bond terms, future price stability, supply and demand of rough or\npolished diamonds, estimated capital costs, the focus of future expenditures,\nfuture forecasts of revenue and variable consideration in determining revenue,\nthe outcome of tax assessments and the likelihood of recoverability of tax\npayments made, activities planned for the UGP in Q2, including to finalize\nproduction shaft equipping and headframe modifications, advance lateral\ndevelopment, and continue operational readiness, estimation of mineral\nresources including the determination of the boundary between South Lobe\nM/PK(S) and EM/PK(S) domains due to the significant grade difference between\nthese two domains, cost and timing of the development of deposits and\nestimated future production, currency exchange rates, rates of inflation,\nrequirements for and availability of additional capital, capital expenditures,\noperating costs, production and cost estimates, tax rates, timing of drill\nprograms, government regulation of operations, environmental risks and\ncompliance obligations, limitations on insurance coverage, and geopolitical\nand economic risks affecting the Company's operational viability including\nsanctions, trade restrictions and tariffs, the impact of the growing supply of\nlaboratory grown diamonds on the demand for and pricing of the Company's\nnatural diamond production, and the risk that continued expansion in\nlaboratory grown diamond production and shifts in consumer preferences could\nfurther adversely impact revenues achievable by the Company, the ability of HB\nto perform its obligations, including making timely payments to the Company,\nand the concentration of credit risk associated with HB representing a\nsignificant proportion of the Company's total revenue, that carat production\nand revenues from the processing of run-of-mine ore stockpiles will be\nsufficient to support the Company's operations and liquidity requirements\nduring the period prior to the achievement of commercial production from the\nUGP, and the ability of key contractors, including the lateral development\ncontractor, to perform their obligations under their respective agreements in\nthe manner and timeframe contracted for, and the risk that any failure or\ndelay in contractor performance could result in material delays to the UGP and\nincreased project costs.\n\nWhile these factors and assumptions are considered reasonable by the Company\nas at the date of this news release in light of management's experience and\nperception of current conditions and expected developments, these statements\nare inherently subject to significant business, economic and competitive\nuncertainties and contingencies. Known and unknown factors could cause actual\nresults to differ materially from those projected in the forward-looking\ninformation and undue reliance should not be placed on such information. Such\nfactors include, but are not limited to: the timing, scope and cost of\nadditional grouting events at the UGP, the Company's ability to comply with\nthe terms and covenants of the Bonds, the consequences of any defaults under\nthe Bonds including the potential enforcement of security granted to\nbondholders over the assets of the Company and its subsidiaries, that expected\ncash flow from operations, combined with external financing will be sufficient\nto complete construction of the UGP, credit risk, price risk, that the\nestimated timelines to achieve mine ramp up and full production from the UGP\ncan be achieved, that sufficient run-of-mine stockpiled ore of sufficient\ngrade and value will be available to generate revenue prior to the achievement\nof commercial production from the UGP, the economic potential of a mineralized\narea, the size and tonnage of a mineralized area, anticipated sample grades or\nbulk sample diamond content, expectations that the UGP and the pit steepening\nproject will extend mine life, forecasts of additional revenues, future\nproduction activity, that depletion and amortization expense on assets will be\naffected by both the volume of carats recovered in any given period and the\nreserves that are expected to be recovered, the future price and demand for,\nand supply of, diamonds, expectations regarding the scheduling of activities\nfor the UGP.\n\nForward-looking information and statements are based on the opinions and\nestimates of management as of the date such statements are made, and they are\nsubject to several known and unknown risks, uncertainties and other factors\nwhich may cause the actual results, performance or achievements of the Company\nto be materially different from any future results, performance or achievement\nexpressed or implied by such forward-looking statements due to a variety of\nrisks, uncertainties, and other factors, including, without limitation, those\nreferred to in this news release. The foregoing is not exhaustive of the\nfactors that may affect any of our forward-looking statements. The Company\nbelieves that expectations reflected in this forward-looking information are\nreasonable, but no assurance can be given that these expectations will prove\nto be correct. Certain risks which could impact the Company are discussed\nunder the heading \"Risks and Uncertainties\" in the Company's MD&A and in the\nCompany's most recent AIF available at SEDAR+ at www.sedarplus.ca.\n\nAlthough the Company has attempted to identify important factors that could\ncause actual actions, events or results to differ materially from those\ndescribed in forward-looking statements, there may be other factors that cause\nactions, events or results not to be as anticipated, estimated or intended.\nAccordingly, readers and investors should not place undue reliance on\nforward-looking statements. Forward-looking information and statements\ncontained in this news release are made as of the date of this news release\nand accordingly are subject to change after such date. Except as required by\nlaw, the Company disclaims any obligation to revise any forward-looking\ninformation and statements to reflect events or circumstances after the date\nof such information and statements. All forward-looking information and\nstatements contained or incorporated by reference in this news release are\nqualified by the foregoing cautionary statements.\n\nFor further information, please contact: Vancouver: Hannah Reynish, Investor\nRelations & Communications, +1 604 674 0272, info@lucaradiamond.com; Sweden:\nRobert Eriksson, Investor Relations & Public Relations, +46 701 112615,\nreriksson@rive6.ch\n\nView original\ncontent:https://www.prnewswire.co.uk/news-releases/lucara-announces-q1-2026-results-302766309.html\n\n\n\nCopyright (c) 2026 PR Newswire Association,LLC. All Rights Reserved."},"type":"article","timestamp":"2026-05-07T21:37:48.010244412Z","server_sent_at_ms":1778189868010},"received_at":"2026-05-07T21:37:48.166Z","source_url":null},"analysis":{"id":"21105","press_release_id":"26979","analysis_json":{"industry":{"label":"Metals & Mining","sector":"Materials"},"redFlags":["Q1 2026 revenue declined 28% year-over-year","Operating cost per tonne increased to $24.74"],"eventType":"earnings","narrative":"Lucara Diamond Corp. reported Q1 2026 revenue of $21.8 million, a 28% decline from $30.3 million in Q1 2025, due to unseasonal weather disrupting open pit mining and increased reliance on lower-grade stockpiles.\n\nThe company successfully raised C$165 million in equity and $350 million in senior secured bonds, strengthening its balance sheet and repaying $220 million in project debt. It ended the quarter with $244.3 million in cash.\n\nLucara maintained its full-year revenue guidance of $100 million to $130 million, supported by the planned return to open pit mining and continued processing of high-value stockpiles. The company also reaffirmed its 2026 UGP capital expenditure guidance of up to $110 million.","sentiment":"bearish","agentHooks":{"shouldPost":true,"suggestedAngle":"Lucara's Q1 revenue fell 28% YoY due to weather disruptions and lower-grade stockpiles, but the company maintained full-year guidance and announced significant financing for the Karowe Underground Project."},"keyFigures":{"revenue":21800000,"revenueYoy":"28%","customDimensions":{"2026_ugp_capex":"$110M","2026_revenue_guidance":"$100M to $130M","operating_cost_per_tonne":24.74}},"quotedText":"Q1 2026 represents a pivotal milestone for Lucara. The successful execution of our financing strategy for the Karowe Underground Project has strengthened our balance sheet, providing the financial flexibility to advance one of the world's most exceptional diamond assets.","namedEntities":{"people":[{"name":"William Lamb","role":"President & CEO"},{"name":"Hannah Reynish","role":"Investor Relations & Communications"},{"name":"Robert Eriksson","role":"Investor Relations & Public Relations"}],"products":["Type IIa diamonds","Karowe Underground Project","Clara Diamond Solutions"],"companies":[{"name":"Lucara Diamond Corp.","ticker":"LUC"},{"name":"HB Trading BV","ticker":"HB"},{"name":"Bergs Securities AB","ticker":"Bergs"}],"dollarAmounts":[{"amount":"$21.8 million","context":"Q1 2026 revenue"},{"amount":"$30.3 million","context":"Q1 2025 revenue"},{"amount":"$244.3 million","context":"Cash and restricted cash at March 31, 2026"},{"amount":"$350.0 million","context":"Senior secured bonds issued in Q1 2026"},{"amount":"$19.0 million","context":"UGP capital expenditures for Q1 2026"},{"amount":"$100M to $130M","context":"2026 diamond revenue guidance"},{"amount":"$110M","context":"2026 UGP capital expenditure guidance"},{"amount":"$11.5M","context":"2026 sustaining capital expenditure guidance"}]},"materialImpact":{"score":3,"reasoning":"Q1 2026 revenue declined by 28% year-over-year to $21.8 million, driven by lower-grade stockpile processing due to weather disruptions. Operating costs increased to $24.74 per tonne processed. However, the company maintained its full-year revenue guidance and announced significant capital expenditures for the Karowe Underground Project."},"tickerRelevance":{"others":[{"ticker":"HB","relevance":"customer"},{"ticker":"Bergs","relevance":"advisor"}],"primary":"LUC"},"globalImportance":45,"audienceRelevance":35,"eventTypeSecondary":["operations_update"],"importanceComponents":{"tickerTier":"mid-cap","eventImpact":"moderate_negative_impact_on_revenue_and_operating_costs","eventGravity":"revenue_decline_and_significant_capital_expenditures","sectorWeight":"metals_and_mining"}},"event_type":"earnings","event_type_secondary":["operations_update"],"sentiment":"bearish","material_impact_score":3,"narrative":"Lucara Diamond Corp. reported Q1 2026 revenue of $21.8 million, a 28% decline from $30.3 million in Q1 2025, due to unseasonal weather disrupting open pit mining and increased reliance on lower-grade stockpiles.\n\nThe company successfully raised C$165 million in equity and $350 million in senior secured bonds, strengthening its balance sheet and repaying $220 million in project debt. It ended the quarter with $244.3 million in cash.\n\nLucara maintained its full-year revenue guidance of $100 million to $130 million, supported by the planned return to open pit mining and continued processing of high-value stockpiles. The company also reaffirmed its 2026 UGP capital expenditure guidance of up to $110 million.","key_figures":{"revenue":21800000,"revenueYoy":"28%","customDimensions":{"2026_ugp_capex":"$110M","2026_revenue_guidance":"$100M to $130M","operating_cost_per_tonne":24.74}},"named_entities":{"people":[{"name":"William Lamb","role":"President & CEO"},{"name":"Hannah Reynish","role":"Investor Relations & Communications"},{"name":"Robert Eriksson","role":"Investor Relations & Public Relations"}],"products":["Type IIa diamonds","Karowe Underground Project","Clara Diamond Solutions"],"companies":[{"name":"Lucara Diamond Corp.","ticker":"LUC"},{"name":"HB Trading BV","ticker":"HB"},{"name":"Bergs Securities AB","ticker":"Bergs"}],"dollarAmounts":[{"amount":"$21.8 million","context":"Q1 2026 revenue"},{"amount":"$30.3 million","context":"Q1 2025 revenue"},{"amount":"$244.3 million","context":"Cash and restricted cash at March 31, 2026"},{"amount":"$350.0 million","context":"Senior secured bonds issued in Q1 2026"},{"amount":"$19.0 million","context":"UGP capital expenditures for Q1 2026"},{"amount":"$100M to $130M","context":"2026 diamond revenue guidance"},{"amount":"$110M","context":"2026 UGP capital expenditure guidance"},{"amount":"$11.5M","context":"2026 sustaining capital expenditure guidance"}]},"model_name":"Qwen/Qwen3-32B-AWQ","prompt_hash":"sha256:f66160e0fe5301b2","schema_hash":"sha256:12363694422af5d9","created_at":"2026-05-08T05:22:00.451Z","global_importance":45,"audience_relevance":35,"importance_components":{"tickerTier":"mid-cap","eventImpact":"moderate_negative_impact_on_revenue_and_operating_costs","eventGravity":"revenue_decline_and_significant_capital_expenditures","sectorWeight":"metals_and_mining"}},"durationMs":31452,"modelName":"glm-4.7"}}